-
Data release - as updated [made at SA Director of Mines' discretion] : Prospect Hill. Annual reports for the period 25/7/2006 to 24/7/2018.
Continued evaluation of possible economic primary tin oxide mineralisation at three known separate occurrences in the Prospect Hill area, lying 20 km north-west of Moolawatana Homestead, has focussed on the untested zone immediately below the known...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document
-
RB 2003/00021 Musgrave Province - Geological summary and exploration history.
The Musgrave Province is largely incorporated within the Anangu Pitjantjatjara Lands and includes cratonic crystalline middle Proterozoic basement rocks of the Musgrave Province proper, as well as mantling younger sedimentary rock successions...-
Document
Published: 01 Nov 2003
-
RB 2005/00007 Lake Gairdner “section 12 determination” – Mineral Potential
The proposed Lake Gairdner 'section 12 determination' area has the potential to host significant mineral deposits. The area lies close to two major geological boundaries; to the immediate north is the Yerda Shear Zone, and to the west, the Yarlbrinda...-
Document
Published: 01 May 2005
-
RB 2004/00010 Port Pirie Treatment Plant. Management plan Phase 1 - preliminary investigation 2004
This report is Phase 1 of a management plan for the former Port Pirie Uranium Treatment Plant site, and is essentially a preliminary investigation to establish a greater understanding of the characteristics of the site. Phase 2 will follow on from...-
Document
Published: 01 Jul 2004
-
Poochera. Partial surrender report for the period 8/1/1996 to 7/1/1999.
An aeromagnetic survey was followed by soil and calcrete sampling in the Poochera - Wirulla area, over possible southerly extensions to the Yarlbrinda Shear Zone. Only slightly elevated Au and Cu values were returned, and follow-up sampling in one...-
Document