-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Coober Pedy. Investigation of alunite occurrence.
At the request of several interested parties from Coober Pedy, 17 channel and grab samples of alunite-bearing clays obtained from opal workings near the town were analysed for their alunite content and its purity. Recent inspections by the author of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Mulga, Wooltana and Paralana areas (Frome Basin Project). Joint annual reports for the period 24/9/2012 to 31/12/2018.
The continuation of Heathgate's programme of exploration for economic buried Tertiary sediment-hosted uranium mineralisation within part of the north-western Frome Embayment during 2012-2013 has comprised exploratory drilling of 36 vertical rotary mud...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 2009
-
Data release [made at SA Director of Mines’ discretion] : Arkaroola, Moolawatana and Mount Hopeless (the Frome Basin Project). Joint annual report for the period 1/1/2016 to 31/12/2018.
Exploration Licence 5017 Arkaroola, Exploration Licence 5118 Mt Yerila and Exploration Licence 5261 Petermorra cover a combined area of approximately 1831 square km within the northern Flinders Ranges and the Frome Basin. The area is being targeted...-
Document
Published: 16 Jan 2019
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 2006
-
The Lake Eyre Project. Joint first annual report plus final report to project licences' joint full surrender, for the period 3/5/2011 to 7/3/2013.
A large area surrounding the southern end of Lake Eyre, which is known to be underlain by a thinning succession of Cretaceous basinal sediments, was taken up to explore for possible economic secondary sandstone-hosted uranium mineralisation. No field...-
Document
Published: 27 Mar 2013
-
Data release - as updated [made at SA Director of Mines’ discretion] : North Mulga. Annual reports to licence expiry/renewal, for the period 10/7/1997 to 23/9/2012.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately east and north-east of the Beverley uranium deposit and covering the northern end of the...-
Document
Published: 05 Nov 2012
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 2014