-
Paratoo (was formerly part of the Grainger Project; recently made part of the Flinders Ranges JV Project). Annual reports from the time of cessation of previous joint venture(s) reporting, for the period 20/7/2007 to 1/11/2016.
During 2007-2008, the first year of the diamond exploration joint venture with the Filsell brothers in the Paratoo area, Flinders Mines' activities comprised: • acquiring part of a detailed helicopter-borne infill aerial magnetic ('helimag') survey,...-
Document
Published: 30 Jan 1919
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Vernon Hill. Annual and final reports for the period 12/7/1993 to 1/9/1997.
Diamond and base metal exploration carried out north-east of Marla comprised gravel, soil and rock sampling, helicopter and ground magnetometry, RC drilling (7 holes, total 647 m) and an airborne EM survey. Chromite anomalies were located in the...-
Document
-
Oraparinna. Progress reports to licence surrender for the period 1/12/1967 to 9/4/1969.
Widespread copper carbonate and weathered, disseminated sulphide mineralisation occurring within large diapiric breccias at Oraparinna and Wirrealpa, that are located respectively ~ 35 km north-northeast of Hawker and 20 km east of Blinman, was found...-
Document
Published: 17 Feb 1969