-
Cooper Hill. Annual reports and final report to licence expiry/full surrender, for the period 4/7/2003 to 24/8/2009.
An area located approximately 90 km west-northwest of Ceduna, which was considered prospective for economic buried nickel, copper and cobalt mineralisation in Voisey's Bay type deposits that could possibly have formed in Proterozoic basement...-
Document
Published: 23 Oct 1909
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Woomera and Wirrappa. Annual reports and first joint annual report, plus final report to licences' joint full surrender, for the period 14/1/2013 to 13/11/2018.
Two adjacent areas located immediately south and east of Woomera township were taken up to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence...-
Document
Published: 07 Jan 1919
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill, Commonwealth Hill Station - Central and East, and Aurora Tank areas (the Commonwealth Hill Project). Joint annual reports for the period 1/7/2013 to 30/6/2018.
During the sixth year of the project, base metals exploration was focussed on the Mars-Aurora Tank, Wirrida and Bundi prospects using ground gravity and IP survey methods. Some trial magnetotelluric and audio-frequency magnetotelluric survey profiles...-
Document
Published: 05 Sep 1918
-
Kolballa. Progress reports and final report to licence full surrender, for the period 31/8/1990 to 15/7/1992.
TARGET: (Stockdale) Diamonds in the Elliston region, related to possible kimberlite primary sources that may be associated with the deep-seated Polda Trough structural feature; (BHP) Mineral sands in Tertiary sediments. EXPLORATION: Stockdale...-
Document
-
RB 71/00057 Tarcoola-Alice Springs railway ballast seismic survey. Report no. 1. The Perfection Well area in Ingomar and McDonall 1:63 360 sheet areas - Commonwealth Railways.
There is no abstract created for this record-
Document
Published: 01 Jan 1971
-
Oak Dam (part of the Gawler Craton Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 17/7/2006 to 16/7/2011.
EL 3603, located on the Stuart Shelf approximately 50 km south of Olympic Dam, was taken under licence to explore for possible economic iron oxide - associated copper-gold-uranium (IOCG-U) deposits of Olympic Dam style that may have formed in...-
Document
Published: 28 Sep 1911
-
Lake Gilles - Uno [Range] area. Annual reports and final report to licence expiry/full surrender, for the period 11/2/2001 to 28/9/2010.
Exploration of an area abutting the northern side of Lake Gilles, and located in the vicinity of the major Uno Fault structure and the Gawler Ranges volcanic province, 70 km north-west of Whyalla, has sought to find economic epithermal/hydrothermal,...-
Document
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 1910
-
Data release [made at SA Director of Mines' discretion] : Karkarook. Annual reports to licence expiry/renewal, for the period 17/9/1998 to 16/9/2003.
Holocene lacustrine gypsum beds, believed to have formed around 6000 years ago by the evaporation of saline water in a series of shallow lakes and lagoons that had developed along the ancestral Driver River watercourse, were the objectives of early...-
Document
-
Data release - as updated : Mount Paisley (part of the Mount Woods JV Project). Annual reports to the commencement of project licences' joint reporting, plus final report to licence expiry/full surrender, for the period 23/3/2000 to 10/5/2014.
Possible iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits which may have formed within buried Proterozoic basement are being targeted in an area centred about 145 km south-east of Coober Pedy and 100 km north-west...-
Document
Published: 24 Jun 1914
-
Wildingi Claypan (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 5/10/2005 to 13/1/2015.
Two separate small areas located just north of Comet Outstation, that were originally taken up to explore for possible diamonds and Triassic-Jurassic kimberlite intrusions that could be associated with intensely faulted shallow basement, have also...-
Document
Published: 19 Dec 1914
-
Mount Clarence (part of the Coober Pedy Project). Joint annual reports, annual reports and final report to licence full surrender, for the period 23/8/2010 to 10/12/2015.
An area centred ~40 km north-west of Coober Pedy, and lying in the northern part of the Gawler Craton near the centre of the Mabel Creek Ridge crustal element and to the north of the east-trending Karari Fault Zone, has been explored for possible...-
Document
Published: 18 Dec 1915
-
Leonard Rise and Giddi Giddinna Creek (part of the Coober Pedy Project). Joint final report at licences' respective surrender, for the period 23/8/2010 to 23/3/2012.
Two areas located respectively immediately to the south-west and the north-west of Coober Pedy, and lying in the northern part of the Gawler Craton near the southern margin of the Mabel Creek Ridge crustal element and to the north of the east-trending...-
Document
Published: 20 Jun 1912
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908