-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 2 Identification and Evaluation of Assessment Criteria.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 Feb 1997
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 3 Validation of Assessment Criteria and Methodologies.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 Aug 1997
-
RB 60/00082 Coober Pedy Opalfield.
Mapping of the Coober Pedy Opalfield has shown that opal occurrence, although erratic, is not entirely unpredictable. Several groups of workings are present in an area of about 150 square miles. The host rock is a distinctive pink and white...-
Document
Published: 30 Apr 1965
-
RB 98/00016 Statement of environmental objectives for seismic operations in the Cooper and Eromanga Basins, South Australia.
This document contains the environmental objectives relating to seismic exploration activities required to be achieved by any licensee operating in the South Australian part of the Cooper and Eromanga Basins (i.e. any operator). Objectives have been...-
Document
Published: 01 May 1998
-
RB 89/00066 GAB field survey - 1986/1987.
Data collected from 116 flowing and 24 non-flowing wells included shut in pressure, temperature, flow rate, pH, headworks condition and full chemical analyses of water samples. An observation network is to monitor controlled flowing wells every 2 years.-
Document
Published: 01 Aug 1989
-
RB 97/00040 Western Prospects Seismic Survey application in the Coongie Lakes Control Zone. Assessment report and recommendations.
The high environmental values of the Coongie Lakes area are recognised through their inclusion in the Register of the National Estate, their inclusion as a wetland of international importance under the Ramsar Convention, and wider acknowledgement that...-
Document
Published: 31 Jul 1997
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 1 Impact Identification.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 09 Jan 1996
-
Criteria for the Abandonment of Seismic Lines and Wellsites in the South Australian Portion of the Cooper Basin - Stage 4 Derivation of Criteria.
This review is aimed at identifying and assessing the impacts of seismic lines and wellsites in the South Australian area of the Cooper Basin. The impacts are assessed in terms of their relative significance (adverse or long lasting effects) to the...-
Document
Published: 01 May 2000
-
Olympic Dam Project. [Artesian] mound springs of the Lake Eyre South region [environmental] monitoring : half-yearly reports for the period from April 1998 to October 2005.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Mount Toodla. Combined fourth annual and final report at licence surrender, for the period 3/5/1999 to 2/5/2003.
The targets of exploration in the Mt Toodla area, situated 50 km south-east of Oodnadatta, were concealed deposits of Olympic Dam style Cu-Au-U-REE and Fe-oxide Cu-Au (IOCG) style mineralisation having less than 200 m thickness of cover. Work...-
Document
-
Mount Toodla. First partial surrender report, for the period 3/5/1999 to 12/5/2002.
The targets of exploration in the Mt Toodla area, located 50 km south-east of Oodnadatta, were Olympic Dam style Cu-Au-U-REE and Candelaria style Fe-oxide Cu-Au mineralisation in Palaeoproterozoic and Mesoproterozoic metamorphic basement with less...-
Document
-
Nuclear power : a discussion of major issues.
The Honeymoon joint venture partners, AAR Ltd, IOL Petroleum Ltd, Teton Exploration Drilling Co. Pty Ltd and Mount Isa Mines Ltd (MIM:MTA) hold title to a uranium deposit in the Lake Frome area of South Australia. It is proposed that the uranium...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Honeymoon uranium : a summary of the proposed in-situ leach mining operation.
This report discusses technical aspects of the Honeymoon uranium deposit and the proposed in-situ leach mining method intended for extracting about 3000 tonnes of contained U3O8. Economic forecasts and mine development plans are presented as a way of...-
Document
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document
-
South Australia. Miscellaneous, non-tenement related SADM and BMR - authored technical reports for the period 1940 to 1969.
There is no abstract created for this record-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 1917
-
Coober Pedy. Annual reports to licence expiry/full surrender, for the period 1/11/2016 to 31/10/2019.
A large area situated on the north-eastern side of the Stuart Range, comprising three separate sub-blocks that taken together are centred ~20 km north of Coober Pedy township, has been explored for possible economic near-surface accumulations of the...-
Document
-
Coober Pedy. First partial surrender report, for the period 1/11/2016 to 31/10/2018.
An area located immediately east and north-east of Coober Pedy is being explored for possible economic near-surface accumulations of the evaporite industrial mineral epsomite. Historic drilling and costeaning in this area performed by CRA Exploration...-
Document