-
Lake Cadi Potash Project. Progress and final reports for the period January 1982 to 10/2/83.
To evaluate potash potential, brine samples were collected from below the dry bed of Lake Cadibarrawirracanna, and analysed for Ca, Mg, Na, K, B, HCO3, C1, total phosphate and sulphate. Potassium contents were too low to be of interest.-
Document
Published: 01 Jan 1982
-
Collaby Hill. Information status at licence full surrender, for the period 6/1/2015 to 14/12/2017 : no work performed.
There is no abstract created for this record-
Document
-
RB 67/00028;Amdel 599 Extraction of sulphur from gypsum, part 1.
Background: Australia currently imports about 430 000 tons of elemental sulphur per year, valued at about $12,000,000 in 1966. The sulphur is purchased from Canada, the USA and Mexico. The annual production of elemental sulphur in these three...-
Document
Published: 01 Jul 1968
-
Western and southern Lake Eyre Plains. Progress reports to licence expiry for the period 15/1/1970 to 29/1/1971.
There is no abstract created for this record-
Document
Published: 18 Nov 1970
-
Pernatty Lagoon. First partial surrender report at licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Exploration conducted by CSR Ltd for possible economic stratiform base metal deposits in the western part of EL 81 addressed several targets, including Cattle Grid type disconformity - related copper mineralisation, Sweet Nell / MG14 type...-
Document
-
Amdel Project : feasibility study into production of magnesia from [Alberrie Creek] dolomite (Stage 2). Progress report no. 3 for the period 5/10/1970 to 2/11/1970.
Report discusses the scope and costing of a calcining and hydration plant designed to produce 100,000 long tons per annum of 95% MgO from dolomite rock feedstock mined at Alberrie Creek, detailing the many input assumptions made in arriving at final...-
Document
Published: 06 Nov 1970
-
Lake Eyre dolomite.
Geological investigations carried out on the Babbage Peninsula at the southern end of Lake Eyre North suggest that an estimated 250 million tons of dolomite, with little or no overburden, is available for mining, and that additional reserves are...-
Document
-
SADM / Amdel Project 1/1/141 : The significance of biotite in [Musgrave Block] granulite facies rocks. Research report.
The project aim was to determine the petrogenetic significance of biotite found in granulite facies metamorphic rocks from the Kenmore Park and Everard areas of the Musgrave Block, and to provide brief mineralogical data on 92 rock samples to indicate...-
Document
-
Progress reports SML 122 South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1968
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 2009
-
Data release - as updated : Lake Harris. Annual reports to licence expiry/full surrender, for the period 15/2/2012 to 14/2/2019.
An area centred ~90 km south-east of Tarcoola and adjacent to the western shore of Lake Gairdner is being explored for possible economic buried Carrapateena or Prominent Hill style IOCG and polymetallic skarn style mineralisation which may be...-
Document
Published: 20 Mar 2019