-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Hamilton Creek. First partial surrender report, for the period 17/5/2010 to 16/5/2014.
EL 4493 lies in the far north of South Australia, abutting the Northern Territory border, and is centred about 30 km east of the Stuart Highway. It falls entirely within the confines of Tieyon Station. Recently, a portion of the licence totalling 218...-
Document
-
Data release - as updated : Boundary Dam. Annual reports to licence expiry/full surrender, for the period 30/7/2007 to 29/7/2016.
A small area centred ~130 km north of Marla, and abutting the Northern Territory border along the northern side of Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which Tianda Uranium (Tianda) thought could...-
Document
-
Data release - as updated : Mount Woodroffe. Licence-specific early annual reports, plus final report to licence full surrender, for the period 5/3/2001 to 29/10/2015.
Mt Woodroffe is an irregularly shaped tenement block covering the central portion of the Musgrave Ranges in the northern part of South Australia. The Ranges lie between the Anangu communities Pukatja and Amata, approximately 550 kilometres by road...-
Document
-
Mount Parlue (part of the Alcurra Project). Annual reports and final report to licence full surrender, for the period 25/6/2013 to 31/8/2017.
An area in Far North SA, centred ~75 km east-southeast of Kulgera on the Stuart Highway, and abutting the SA-NT State border, has been explored for possible buried economic magmatic Ni-Cu-PGE deposits associated with mafic-ultramafic intrusive rocks...-
Document
Published: 31 Aug 1917
-
Mount Irwin (part of the Alcurra Project). First partial surrender report, for the period 25/6/2013 to 30/11/2017.
An area in Far North SA, centred near Mount Irwin on Tieyon Station, is being explored for possible buried economic magmatic Ni-Cu-PGE deposits associated with mafic-ultramafic intrusive rocks of the Proterozoic Giles Complex. Another newly recognised...-
Document
Published: 08 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Caroline, Mount Harcus and Pine Ridge (the Musgrave Project). Joint annual reports for the period 1/7/2011 to 31/12/2018.
Three Exploration Licences spread across the central and eastern Musgrave Ranges are now being explored by NiCul Minerals Limited (a wholly owned subsidiary of PepinNini Minerals Limited) which currently owns 100% of each tenement. The ground held is...-
Document
Published: 28 Feb 1919
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 1917
-
Everard Park Homestead area (part of the Musgrave Project). Final report submitted at licence expiry/full surrender, for the period 19/10/2007 to 18/10/2014.
An area located near the south-eastern margin of the Musgrave Province, in the eastern and northern Everard Ranges about 100 km west-northwest of Marla, wholly within the APY Lands, has been explored for possible economic nickel-copper-platinoid group...-
Document
-
RB 2002/00031 Musgrave Block, central Australia. Regional geology from interpretation of airborne magnetic data.
A regional geological interpretation of newly-acquired magnetic data for the majority of the Musgrave Block (central Australia) has been compiled at 1:250 000 scale. This report outlines the methodology and results of interpretation. Highlights of...-
Document
Published: 01 Aug 2002
-
RB 2012/00008 Abminga bedrock drilling program 2001.
The Abminga bedrock drilling program was initiated in 1999 as part of the Targeted Exploration Initiative of South Australia (TEISA) strategy conceived by the SA Government and implemented through PIRSA's Mineral Resources Group. Drilling was proposed...-
Document
Published: 01 May 2012
-
RB 2013/00011 Geology of the Tieyon 1:100 000 map sheet (5645).
The Tieyon 1:100 000 mapsheet area is located on the South Australia – Northern Territory border in the central Far North of South Australia. It covers rock units of the Mesoproterozoic Musgrave Province, the Mesozoic Eromanga Basin and the Neogene...-
Document
Published: 01 Apr 2013
-
Musgrave Province, including APY Lands, Mineral Potential Modelling Data Package.
The purpose of this data package is to provide end-users with the GIS datasets and geophysical raster grids used for the 2010 modelling of mineral potential in the Musgrave Province region, which includes the APY (Anangu Pitjantjatjara -...-
Model
- ZIP,
-
De Rose Hill. Data release at licence renewal in lieu of first partial surrender report: annual reports for the period 13/12/1996 to 1/4/2007.
Exploration of an area in the eastern Musgrave Ranges located 80 km north of Marla and 65 km south of the SA/NT state border, and which straddles the Stuart Highway, has sought to find possible Giles Complex - hosted magmatic nickel sulphide and...-
Document
Published: 10 Jul 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-05, west-central Musgrave Province: Giles Complex, Harcus intrusion and Purananja intrusion magmatic copper-nickel-PGE prospects. Project interim and final reports.
PepinNini Minerals has recently completed a small stratigraphic drilling programme within the Musgrave Province in South Australia, which was carried out as a collaborative drilling project (DPY4-05) undertaken between the company and the SA...-
Document
Published: 30 Nov 1907
-
Depth To Crystalline Basement Data Package: South Australia (as updated - 2021 version)
The Depth to Crystalline Basement Data Package is a collection of GIS datasets (in ArcGIS and Mapinfo formats) that portray actual or inferred depth to crystalline basement in South Australia, which have been assembled on a province-by-province basis....-
Dataset
Published: 04 Feb 1921
- PDF,
- ZIP
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017