PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release - as updated : The Lake Torrens JV Project. Joint annual reports, plus final report at the joint full surrender of two of the three remaining project licences, for the period 1/1/2012 to 13/10/2018.
During the 2012 Project year, Tasman Resources Ltd (Tasman) carried out the following exploration activities: • obtaining from the Kokatha Native Title claimant group's representatives, after considerable effort, some restricted Aboriginal heritage...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Data release [made at SA Director of Mines' discretion] : Moonta - Wallaroo area (where licence is subject in part to the Moonta Porphyry Joint Venture). Annual reports for the period 24/12/1996 to 11/4/2008. [ Index Part 1 of 2 ].
A 106 square km area, comprising two blocks which cover the main historic copper and gold - producing districts centred around the towns of Moonta and Kadina, is being explored afresh in an attempt to identify ore resources of quantity sufficient to...-
Document
-
Geology of the Hillside mine area, Yorke Peninsula, SA.
Exploration of a small area at the historic Hillside mine copper-uranium prospect near Ardrossan on Yorke Peninsula, which is presently covered by Mineral Claim 1115 held by Pegmin Ltd, has been undertaken during late 1979 and early 1980 by option...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf. Progress reports, annual reports and final report to licence renewal / re-issue, for the period 17/6/1986 to 15/9/1996.
On 21/11/1986, Western Mining Corp. (WMC) signed a joint venture agreement with PNC Exploration (Australia) Pty Ltd [a subsidiary of the Power and Nuclear Fuels Corp. of Japan], whereby PNC can earn up to 25% equity in EL 1338 by funding exploration...-
Document
-
Data release [made at SA Director of Mines' discretion] : Moonta - Wallaroo area (where licence is subject in part to the Moonta Porphyry Joint Venture). Annual reports for the period 24/12/1996 to 11/4/2008. [ Index Part 2 of 2 ].
When Phelps Dodge began managing exploration on EL 2885 in mid-2002, its focus was on defining structurally-controlled magnetic targets that had remained untested, but which could host significant sized deposits of Olympic Dam or Ernest Henry type...-
Document
-
West of Lake Eyre area. Annual reports and combined annual reports to licences' joint full surrender, for the period 13/11/2006 to 19/3/2013.
An area of Cretaceous and younger cover located close to the south-western margin of Lake Eyre North, where no previous drilling had occurred, was taken up to explore for possible buried IOCG deposits hosted by the underlying basement, and for...-
Document
-
RB 41/00061 Diamond drilling at the Hillside copper mine, Ardrossan.
A single 70 degrees east-northeastwards inclined diamond drillhole, designed to test for the possible subsurface occurrence of uranium mineralisation at the historic Hillside copper mine, failed to encounter any when it was completed by SADM during...-
Document
Published: 15 Sep 1955
-
Arcoona. Annual reports and final report to licence expiry/full surrender, for the period 21/5/2019 to 20/5/2021.
An area located immediately south-east of Pimba has been explored for possible shallowly buried IOCG mineralisation, with a focus on the iron ore potential of magnetite/haematite breccias associated with this mineralisation type. During the first...-
Document
Published: 13 Jul 2021
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 2018
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 2018
-
The Gawler Craton Project [Part]. Data release made in lieu of partial surrender/joint annual reports for the period 3/2/2010 to 1/2/2019, plus letters giving permission to release owed licence partial relinquishment and surrender reports.
As part of a regional search for possible major deposits of IOCG type mineralisation, Golden Cross Resources took up six exploration tenements in the northern Gawler Craton that lie to the north and north-east of Coober Pedy, and which are within or...-
Document
Published: 23 Jun 2015