Todmorden. Progress reports for the period 21/4/1986 to 20/11/1987.
TARGET: Native sulphur associated with possible salt dome structures, the locations of which were interpreted from past petroleum exploration seismic reflection surveys. EXPLORATION: A detailed gravity survey, and 2 rotary/core drillholes totalling...-
Document
Published: 13 Jan 1988
-
Wintinna Hill, Welbourn Hill Homestead, South Neales River and Mount Willoughby Homestead. Joint progress reports to licences' joint full surrender, for the period 11/11/1986 to 10/11/1987.
An extensive review was undertaken of the potential of the eastern Officer Basin area extending 50-150 km west of Oodnadatta for hosting buried native sulphur deposits in association with salt dome structures, but the recommended follow-up exploration...-
Document
Published: 20 Jan 1988
-
Drilling report, Todmorden 2.
Todmorden 2's primary objective was to confirm an inferred salt dome located below a gravity low anomaly. The well intersected an impervious quartzite cap rock, a dolomitic sandstone with traces of native sulphur, and an evaporite and red siltstone...-
Document
-
Burdunga Rock Hole. Progress reports and final report to licence expiry/full surrender, for the period 28/10/1975 to 19/11/1976.
TARGET: Permian coal in the Tallaringa Trough, east of Maralinga. EXPLORATION: An 11 hole RC drilling programme totalling 1480 m. RESULTS: Eight drillholes intersected up to 4 horizons of lignite and lignitic clay of demonstrated Eocene age, that...-
Document