-
Porter Hill. Annual reports for the period 26/8/1998 to 26/5/2000 (the commencement of the Lake Torrens Project joint reporting period) : part of a data release made on 31/12/2006 upon a subsequent partial surrender.
Following the detection in late 1997, by reconnaissance mobile metal ion partial leach analytical methods, of anomalous base and precious metal concentrations in the soil above several low amplitude magnetic anomalies on Tasman Resources' EL 2340, the...-
Document
Published: 25 Oct 1999
-
Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
Data release [made at SA Director of Mines’ discretion] : Weetulta. Annual reports for the period 16/9/2005 to 15/9/2009.
EL 3413, surrounding the township of Weetulta on the Yorke Peninsula, is located geologically along the prospective south-eastern margin of the Gawler Craton. The licence area, which lies only about 10 km south of Moonta, has several historic mines...-
Document
Published: 20 Oct 1909
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Annual reports for the period 7/10/2013 to 6/10/2018.
An area located ~25 km north-east of Woomera is being explored for possible economic buried Cu-Co-Au mineralisation which may have formed in the Adelaidean metasedimentary cover rocks of the Stuart Shelf. Under Gunson Resource's prior tenure of EL...-
Document
Published: 07 Dec 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Kokatha prospect final report.
27 rotary drill holes (total 213m.) tested for copper-nickel mineralisation associated with a gabbro margin. It was concluded that copper-nickel values of several hundred parts per million is restricted to a small area near the gabbro/hornfels...-
Document
Published: 01 Jan 1969
-
RB 73/00008 Geological survey, Torrens Hinge Zone Project, Bute region. Report no. 1.
This report outlines the history and concept of the Torrens Hinge Zone project. An account is given of the regional geology, geophysics, geochronology and stratigraphic drilling in the Bute region and adjoining areas of northern Yorke Peninsula. An...-
Document
Published: 01 Jan 1973
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 16 - Cockabidnie Project airborne 25Hz TEMPEST electromagnetic geophysical survey. Project PT1-16 final report.
To help with exploration of the ~ 5 km long, NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, to look for a large range of potentially economic basement-hosted polymetallic and other mineral occurrences including iron...-
Document
Published: 15 Oct 1912
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-38, western Eyre Peninsula nickel-copper-platinoid metals mineral prospects. Project final report.
An almost 3000 square km area situated to the north of Coffin Bay and to the east of Elliston, on western Eyre Peninsula, is being explored for possible mafic/ultramafic - hosted magmatic Ni-Cu-PGE deposits, formed in post-tectonic intrusions into the...-
Document
-
RB 2023/00005 BLANCHE 1 (DH 206086) drillhole report. Sedimentary Copper Mineral Systems of the Stuart Shelf GSSA–CSIRO project.
Critical minerals are a collection of metal and non-metal commodities considered essential for economic and industrial development, and for which there are significant concerns around future supply due to resource scarcity or geopolitical factors. The...-
Document
Published: 01 Jul 2024
-
Mulgathing. Progress reports to licence expiry/renewal, for the period 18/11/1968 to 17/11/1969.
Reconnaissance mapping and sampling of an area of poorly exposed Precambrian crystalline basement north of Kingoonya has shown that the regional geology is dominated by intensely folded, discontinuously outcropping banded iron formations that are...-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document