-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
Parabarana copper prospect. Progress reports on rotary percussion and diamond drilling campaigns, for the period February 1970 to January 1971.
An area of 7 square miles surrounding the historic shallowly worked Parabarana copper deposit in the far north-eastern Flinders Ranges, which outcrops at Copper Hill as vein-type disseminated secondary ore over a width of around 1200 feet, was...-
Document
-
Copper and molybdenum mineralisation associated with the Anabama Granite, Olary region, SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1980
-
Data release [made at SA Director of Mines' discretion] : Wadnaminga, Manna Hill, Mount Victor, Yunta and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 3/4/1997 to 18/7/2008.
A group of five adjoining exploration licences covering ~3300 square km situated along the southern flank of the Proterozoic Curnamona Craton (Olary Block) and the adjoining Nackara Arc of the Adelaide Geosyncline is being explored for possible...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-55, exploring Kalkaroo Dome copper-gold mineral prospects for extensions of the Kalkaroo deposit. Project final report.
The Kalkaroo Cu-Au-Mo deposit is located 65 km north of Olary and 100 km west of Broken Hill, and occupies a portion of very prospective Palaeoproterozoic Bimba Formation subcrop, which potentially could have a 40 km strike length around two buried...-
Document
-
Woolatchi Creek. Progress, partial surrender and technical reports to licence surrender, for the period 12/4/1982 to 27/8/1985.
Diamond drillhole WC1 was drilled by Marathon to a total depth of 173.5 m over the Woolatchi Creek aeromagnetic anomaly, as part of an ongoing search for uranium and base metals in the north-eastern Flinders Ranges and Lake Frome Plains region....-
Document