Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
RB 61/00020 Progress report for Polda Basin and Co. Musgrave. Investigation for period ending 30th June 1965.
There is no abstract created for this record-
Document
Published: 01 Jan 1965
-
RB 88/00014 Petroleum exploration and development in South Australia (5th edition).
In South Australia since 1958, 140,400 km of seismic have been recorded (75,500 onshore) and 882 wells drilled (of which 16 are offshore wildcats and 238 are development wells). Exploration and development have taken place in three distinct phases....-
Document
Published: 01 Mar 1988
-
RB 90/00074 Explanatory Notes for the ELLISTON 1:250 000 map sheet.
There is no abstract created for this record-
Document
Published: 01 Nov 1990
-
RB 89/00018 Petroleum exploration and development in South Australia (6th edition).
There is no abstract created for this record-
Document
Published: 01 Apr 1989
-
RB 91/00081 Eyre Peninsula. A brief review of mining and mineral potential.
Several commodities are currently mined on Eyre Peninsula including iron ore, dolomite, graphite, lime sand, gypsum, silica, granite, nephrite jade, talc and salt. Historically, copper, lead, silver and gold have also been mined and there are known...-
Document
Published: 01 Jul 1991
-
Venus Bay. First partial relinquishment report for the period 26/4/2002 to 25/4/2004.
Exploration for possible diamondiferous kimberlite in the Venus Bay area of western Eyre Peninsula, located approximately 45 km south-east of Streaky Bay and 70 km north of Flinders Island, has formed part of a regional search by Orogenic Exploration...-
Document
-
Colton. Combined third annual / final report to licence expiry/full surrender, for the period 26/4/2002 to 25/4/2005.
Exploration for possible diamondiferous kimberlite in the Colton area of western Eyre Peninsula, located approximately 95 km south-east of Streaky Bay and 35 km north-east of Flinders Island, has formed part of a regional search by Orogenic...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Lock Project. Joint annual reports, for the period 22/4/2014 to 26/10/2018.
Two licences covering the undeveloped Jurassic coal measures of the Lock Coalfield have been taken up to allow initially for conducting research into the current technological and economic prospects for utilisation of the coal. Numerous samples of...-
Document
-
EPP 5, Eucla, Duntroon and Bight Basins (Ceduna Terrace). Progress and technical reports for the period 20/9/68 to 13/1/76.
The programme of work pursued over EPP 5 was as follows: Permit Year 1 - interpretation of 407 line km of regional reconnaissance 6 and 24-fold reflection seismic data recorded in the 1968-69 R 3 Marine Seismic Survey, plus the ongoing review and...-
Document
Published: 13 Jan 1976
-
Venus Bay. Progress reports and final report to licence full surrender, for the period 9/1/1991 to 9/7/1992.
TARGET: Diamonds in 3 areas, one west of Lock, another east of Elliston, and the third surrounding Venus Bay. EXPLORATION: Heavy mineral sampling, airborne magnetic and multichannel radiometric surveys, ground magnetic surveys, and selected anomaly...-
Document
-
Review of the conceptual mining study for the Lock coal deposit.
Original study indicated that the deposit contained sufficient Jurassic coal reserves to fuel a 750 MW power station. The reappraisal gives cost estimates for a mine supplying a 500 MW power station.-
Document
-
Lock. Progress and final reports for the period 20/8/79 to 14/9/84.
A large coalfield exists in the Polda Basin, west of Lock, on central Eyre Peninsula. One Jurassic coal deposit in the Polda Formation and 2 discrete Tertiary deposits have been recognized, containing reserves of over 300 million tonnes of Jurassic...-
Document
Published: 26 Sep 1984
-
Final drilling report - CRAE boreholes 83KD1 and 83KD1A.
The intersection of massive halite in the ?Lower Palaeozoic sequence in Occidental Petroleum's Mercury 1 wildcat oil exploration well drilled in the offshore Polda Basin generated interest in the Tuckey area onshore for potash associated with similar...-
Document
-
Mount Wedge. Progress reports and final report to licence expiry/full surrender, for the period 11/1/1984 to 10/1/1985.
Unsuccessful exploration in the central Polda Trough region for possible potash deposits formed within pre-Permian red beds has involved the drilling of a 1398 m deep exploratory/stratigraphic hole (Kilroo 1/83KD1A) plus the acquisition of a limited...-
Document
Published: 16 Apr 1985
-
Lock Coal Deposit - conceptual mine feasibility study.
The Lock Coal Deposit is located 15 km west of the town of Lock, on Eyre Peninsula in South Australia. It contains both Tertiary and Jurassic coals, although neither have been fully delineated. Measured reserves of in-situ Jurassic coal are 260 Mt....-
Document
-
Kolballa. Progress reports and final report to licence full surrender, for the period 31/8/1990 to 15/7/1992.
TARGET: (Stockdale) Diamonds in the Elliston region, related to possible kimberlite primary sources that may be associated with the deep-seated Polda Trough structural feature; (BHP) Mineral sands in Tertiary sediments. EXPLORATION: Stockdale...-
Document
-
EPP SA-15, offshore Polda Basin, South Australia. Progress, permit review, technical and surrender reports for the period 17/10/75 to 3/5/83.
During their 7 year tenure of EPP 15, which comprised an area of 200 offshore graticular blocks covering the portion of the Polda Basin underlying the continental shelf, the permit operator(s) carried out the following major exploratory work: (1)...-
Document
-
Polda Basin source rock studies. Data.
There is no abstract created for this record-
Document
Published: 18 Sep 1991
-
Scientific investigation survey, Great Australian Bight, November 1989 to March 1990. Reports.
BP Exploration Company Ltd Research Unit (Sunbury, England) flew an airborne laser fluorosensor (ALF) survey over the Great Australian Bight region during the period January-March 1990, as part of BP Australia Ltd's Australian continental shelf...-
Document