-
Alberga. Final relinquishment report for the period 24/9/1973 to March 1974.
Results of water bore sampling (7 samples) and drilling of 6 holes totalling 614 metres were disappointing. The drill holes intersected Adelaidean and Cretaceous sediments underlying Tertiary ? - Quaternary fluviatile sediments, without encountering...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Ungalootanna Hill (part of the Musgrave Project). Annual and final reports to licence surrender, for the period 24/9/1997 to 1/10/2008.
Exploration of an area in the eastern Musgrave Ranges located 70 km north-east of Marla, 10 km south of Mount Irwin Homestead, and 22 km east of the Stuart Highway, has sought to find possible Giles Complex - hosted magmatic nickel sulphide and...-
Document
Published: 26 Jun 1908
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Paralana Creek and Four Mile Creek [part of the Paralana Plains Joint Venture area]. Progress reports for the period 15/4/1968 to 14/4/1971.
A licence area covering the flat alluvial Paralana Plains extending out eastwards from the northern Flinders Ranges was taken up by the the consortium of Exoil NL, Petromin NL and Transoil NL to explore for possible economic buried occurrences of...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Soil and groundwater investigation, Beverley prospect, SML 564. Report on Stage I feasibility study.
The Stage 1 feasibility study carried out during February-May, 1973 has included regional groundwater studies, pumping tests, logging and laboratory tests on drill cores, slope stability analyses, preliminary design of pit slopes and dewatering...-
Document
Published: 31 May 1973
-
Algebuckina. Annual reports to licence expiry/full surrender, for the period 3/8/2008 to 28/9/2014.
The only field work undertaken by Red Metal during its final six years of tenure of EL 3226/4307 Algebuckina was the assaying in 2011 of 88 soil and rock chip samples which it had collected from the vicinity of historically reported surface copper...-
Document
Published: 01 Oct 1914