-
Blanchewater Hill. Progress and final reports for the period 11/8/80 to 10/8/82.
Drilling of two percussion holes (aggregate 400 metres) near Yerila, south of Lake Blanche, failed to give encouragement to the search for possible Permian coal and Tertiary uranium in the southern Eromanga Basin / Lake Blanche Lineament uplift area...-
Document
-
Alberga. Final relinquishment report for the period 24/9/1973 to March 1974.
Results of water bore sampling (7 samples) and drilling of 6 holes totalling 614 metres were disappointing. The drill holes intersected Adelaidean and Cretaceous sediments underlying Tertiary ? - Quaternary fluviatile sediments, without encountering...-
Document
-
Yarramba. Progress reports to licence expiry/renewal, for the period 13/5/1971 to 12/5/1972.
Continuing intensive exploration for economic sedimentary uranium deposits within buried Tertiary palaeochannel sediments in the Yarramba Homestead area, 50 km north-west of Cockburn, which had been invigorated by the recent discovery of strongly...-
Document
-
Lake Carnanto. Progress reports and final report to licence full surrender, for the period 30/11/1978 to 11/2/1983.
The south-eastern Lake Frome Embayment in the vicinity of Quinyambie Station was explored for Upper and Lower Tertiary 'blanket' or 'roll front' type sedimentary uranium, via the drilling of 75 open vertical rotary mud holes with a total penetration...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Notes on the genesis of uranium deposits in the Yarramba Channel [on] EL 85 South Eagle and EL 98 Yarramba.
It is proposed that the buried Tertiary Yarramba Palaeochannel feature hosting the sedimentary uranium mineralisation was incised into Cretaceous and Precambrian basement rocks. Within the channel, quartzose sands and abundant detrital organic matter...-
Document
Published: 02 Jan 1974
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Hamilton Creek. Annual reports plus final report to licence expiry/full surrender, for the period 17/5/2010 to 16/5/2015.
A large area located in the far north of South Australia, abutting the Northern Territory border ~120 km north of Marla, and centred ~30 km east of the Stuart Highway wholly on Tieyon Station, has been explored for possible economic buried secondary...-
Document
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Summary report on Honeymoon assessment programme (Phase 1), Honeymoon uranium deposit, South Australia.
This report summarises results of a rotary drilling and coring programme undertaken between 21/10/1978 and 16/2/1979 at the Honeymoon uranium deposit. 99 open plug holes totalling 12,452.7 m and 16 core holes totalling 1894 m were drilled in a...-
Document
-
Lake Frome [part of the Paralana Plains Uranium Project joint venture area]. Progress reports and technical reports to licence surrender/re-issue over a different area, for the period 22/4/1971 to 21/4/1973.
Exploration on SML 564 has consisted of a continuation of deep rotary mud open hole, plug and core drilling plus washing-out of existing, older Petromin "P...w" series drillholes to allow new generation downhole geophysical logging, aimed at further...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document