-
EPP 23, Otway Basin, South Australia. Evaluation report.
In order to examine the prospectivity of EPP 23, for which they assumed the operatorship by a 65% farm-in in August 1990, BHP Petroleum have examined well palynological and geochemical data in and around the permit and have interpreted over 600 km of...-
Document
-
PEL 22 exploration guidelines and the prospects for locating hydrocarbons (in) the Gambier Embayment, South Australia.
This study concentrates on the correlation of lithostratigraphic units, establishing a model for the likely source rock maturity pattern, and elucidating the structure, seal and reservoir relationships. The Early Cretaceous Otway Group is considered...-
Document
-
Hydrocarbon potential of S87-1 application area, Otway Basin.
There is no abstract created for this record-
Document
-
Review of the geology, geophysics and directions for future petroleum exploration, EPP SA-2, offshore Otway Basin, South Australia.
This consultant's report prepared for the EPP SA-2 operator comprises a review of the regional basinal geology, tectonics and stratigraphy, petroleum exploration history and recorded hydrocarbon occurrences, seismic coverage and interpretive results,...-
Document
-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
Kentgrove 1. Test reports.
Contains open hole drillstem test raw field data only.-
Document
Published: 30 Nov 1976
-
Preliminary report on the biomarker geochemistry of rock extracts from Chama 1A and Geltwood Beach 1: comparison with some Otway oils and coastal bitumens.
Organic geochemical analyses were carried out on 6 rock sample pyrolysis extracts from Chama 1A and 7 from Geltwood Beach 1 to determine whether the Crayfish and/or Eumeralla formations in these wells could be a source for the asphaltites and bitumens...-
Document
-
1987 seismic survey, Orana, final report.
AIM: The 1987 Orana Seismic Survey, consisting of 14 lines with a total coverage of 55.6 line kms, was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, other than the single lead (McNamara Prospect) which was confidently...-
Document
-
1986 seismic survey, Burrungule detail, operations report.
AIM: This seismic survey of 35 lines with a total coverage of 200.1 line kms was shot to further detail leads identified by the 1985 Burrungule Seismic Survey, and thereby attempt to upgrade at least two of them to drillable prospect status. The work...-
Document
-
1985 seismic survey, Burrungule, final report.
AIM: This seismic survey of 32 lines with a total 352.26 line kms coverage was conducted in the two most prospective areas of the licence in order to fulfil the Licence Year 1 work commitment of at least 250 line kms of seismic acquisition. The two...-
Document
-
Zema 1. Test reports.
Contains a report by the wireline logging contractor Schlumberger on the checkshot survey of the well used to calibrate the sonic log and generate synthetic seismograms, a separate pre-interpretation report by Schlumberger on MSD (mean square dip)...-
Document
Published: 31 Mar 1992
-
1990 Kongorong (Experimental) Seismic Survey. Final geophysical report.
AIM: To ascertain whether existing seismic data obtained from beneath the Pebble Point Formation could be upgraded so that the primary reservoir, the Waarre Sandstone, might be mapped with a greater degree of confidence in the southern part of the...-
Document
-
Preliminary review of the Otway Basin.
There is no abstract created for this record-
Document
Published: 01 Jan 1966