-
AnnRep 1922 South Australia. Annual report of the Director of Mines and Government Geologist for 1922.
There is no abstract created for this record-
Document
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010
-
Yarrana Hill, Dunn Hill, Wallala Hill and Mount Centre (the Ceduna heavy minerals Project). Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 21/12/1989 to 20/6/1991.
TARGET: Possible Tertiary marine placer deposits of heavy mineral sands (ilmenite, rutile, zircon) on the south-eastern margin of the Eucla Basin in the Nunjikompita - Hiltaba area, 100 km east of Ceduna. EXPLORATION: A consultants' photogeological...-
Document
Published: 16 Oct 1991
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document
-
Yednalue. Second partial surrender report, for the period 29/4/2001 to 8/5/2014.
Early during licence Year 13, two separate portions of EL 4935 together totalling 46 square km or 83.6% of the licence's former area have been relinquished due to the chance of discovery there of gold and base metals by a small, self-funded explorer...-
Document
Published: 25 Mar 1914
-
RB 2024/00007 The mines and geology of the Mongolata Goldfield.
Mapping and sampling of 39 adits at Mongolata Goldfield has ensured that a permanent record of the 1930s mines is available for historical and exploration purposes. Many of the workings are no longer accessible. Details of the production history of...-
Document
Published: 01 Feb 2024
-
PGER 00354 GEL 571-574 Torrens decommissioning activities - EIR - 18 March 2025
Section 10 of the Petroleum and Geothermal Energy Regulations 2013 require a licensee to prepare an Environmental Impact Report (EIR) detailing the environment of the area included in the scope of the proposed activity. An EIR must identify any events...-
Document
Published: 18 Mar 2025
-
PGER 00355 GEL 571-574 Torrens decommissioning activities - SEO - 18 March 2025
The intent of the SEO is to outline the environmental objectives that Torrens Energy will achieve during future monitoring, maintenance, rehabilitation and decommissioning activities for previously drilled geothermal drill holes, and the criteria upon...-
Document
Published: 18 Mar 2025
-
PGER 00356 GEL 571-574 Torrens decommissioning activities - EIC - 15 April 2025
Pursuant to Section 98 of the Petroleum and Geothermal Energy Act 2000 the Minister must classify the regulated activities covered by a prepared Environmental Impact Report as either of low, medium or high environmental impact. This document...-
Document
Published: 15 Apr 2025