RB 51/00052 Progress report on survey of stone deposits for the proposed River Murray storage - EWS Department.
The report describes the progress made to September 1st 1960 of a survey of stone deposits within a 50 mile radius of the Chowilla Damsite. It is concluded that only shallow deposits of variable quality will be available within 30 miles of the site...-
Document
Published: 01 Jan 1960
-
RB 59/00124 Chowilla Dam Project: embankment materials, rip-rap investigation. Progress geological report.
At a meeting of the Chowilla Dam Technical Committee on 9th November, it was requested that the Mines Department prepare a progress statement on the investigations being carried out for the location and proving of rip-rap sources. This report was...-
Document
Published: 01 Nov 1964
-
RB 60/00011 Examination of bore samples for sedimentary phosphate (in the) Murray Basin and Gambier Embayment of the Otway Basin.
In a reconnaissance survey for sedimentary phosphate, sludges and cores were examined from 100 widely-scattered bores in parts of the Murray Basin and the Gambier Embayment of the Otway Basin that are located in South Australia. Microscopic inspection...-
Document
Published: 25 Jan 1965
-
RB 72/00140 Monarto town area - Construction materials and foundation conditions.
A proposed new city referred to as Murray New Town, with a possible population of 250 000, is to be built in the Murray Bridge area, west of the Murray River. The city will-occupy an area of approximately 175 sq miles; (450 km2). This report has been...-
Document
Published: 27 Jul 1972
-
RB 75/00011 Monarto construction sand investigation progress report no. 1, Tepko sand deposit - Monarto Development Commission.
Reconnaissance auger drilling for construction sand to supply the proposed new city of Monarto was carried out in the Tepko-Mannum and Hartley-Monarto South areas in 1974 The programme consisted of 79 holes 0.6m to15m deep for a total of 451m. Grain...-
Document
Published: 01 Jan 1975
-
RB 75/00041 Monarto new town - Paragum stratigraphic bore completion report, section 1972-17.
A stratigraphic bore was completed by cable tool drilling to a depth of 48m at Paragum Station, monarto South, in connection with the Regional Hydrological Survey. The hole intersected Blanchetown Clay, Parilla Sand and Mannum Limestone over phyllite...-
Document
Published: 01 Jan 1975
-
RB 74/00005 Proposed subdivision, Murray Bridge, pt secns 65, 66 Hd Mobilong. Report on geological investigations - State Planning Office (Docket 2477/73).
A proposed subdivision at Murray Bridge has been examined with reference to the suitability of the site for residential development. The site is covered by up to 0.30 metres of silt soil overlying calcrete capped limestone and calcareous sandstone...-
Document
Published: 01 Jan 1974
-
RB 74/00084 Construction materials resources, Monarto area.
There is no abstract created for this record-
Document
Published: 01 Jan 1977
-
RB 75/00143 Monarto coarse aggregate investigation limestone and gneiss drilling and testing. Client - Monarto Development Commission.
Sources of coarse aggregate were investigated for the Monarto Development Commission. Recrystallised limestone near Murray Bridge was tested by four diamond drill holes, and gneisses near Pallamana were tested by 8 holes. Large quantities of suitable...-
Document
Published: 01 Jan 1975
-
Waikerie. Annual reports and final report to licence expiry/full surrender, for the period 18/1/2005 to 17/1/2010.
Landmark Stone Pty Ltd was approached by David West (Executive Director, Architectural Conservation, International Conservation Services of Sydney) to investigate re-opening one of the three Waikerie Limestone quarries in the Riverland of South...-
Document
Published: 28 Oct 1909