-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Eyre Peninsula Pb-Zn data package.
Numerous Pb-Zn-Cu-Ag mines and prospects, including the promising Menninnie Dam prospect located 80 km north of Kimba, occur within graphitic, calcareous and psammo-pelitic metasediments of the Palaeoproterozoic (ca 1900-1850 Ma) Hutchison Group on...-
Document
Published: 01 Jan 1991
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
Sheoak Hill. Annual reports, partial surrender report and final report to licence surrender, for the period 9/7/1997 to 8/7/2002.
An area centred 60 km north-west of Cowell was considered prospective for iron mineralisation within banded iron formations of the Middleback Subgroup, and for skarn - type gold and base metals associated with Hutchison Group metasediments. Following...-
Document
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-33, central eastern Eyre Peninsula, Ethiopia radiometric target Proterozoic mesothermal / metamorphic basement uranium prospect. Project final report.
Adelaide Resources made application for PACE Initiative Year 4 funding in 2006 (Project DPY4-33) to drill for possible primary uranium mineralisation, following the identification of a spectral anomaly that arose from the reprocessing of radiometric...-
Document
-
RB 2012/00019 Geochemistry of pre-1570 Ma mafic magmatism within southern Australia: implications for possible tectonic settings and timing of major mineralisation events in South Australia.
Geochemical and isotopic data from mantle-derived mafic rocks provide important constraints on our understanding of the composition and evolution of the lithosphere through time. Since the lithosphere is sensitive to tectonic processes such as...-
Document
Published: 01 Dec 2012
-
ExpNotes LINCOLN: Explanatory Notes LINCOLN
The LINCOLN 1:250,000 scale regional geological map area covers southern Eyre Peninsula and includes numerous islands lying off its eastern, southern and western coasts. The region encompasses a complex geological history and contains a variety of...-
Document