-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 94/00044 Soil air carbon dioxide and oxygen as a guide to oxidising sulphide concealed beneath shallow cover. Soil air CO2/O2 project: review report 1.
A joint project between Dr I.G. Watmuff (consultant) and the Department of Mines and Energy, South Australia, to appraise the soil air CO2/O2 technique as a guide to concealed oxidising sulphides, has been completed. Testing was conducted over known...-
Document
Published: 01 Oct 1994
-
RB 95/00029 Leigh Creek Coalfield, Lobe E coal deposit. Geological report.
In 1993 an exploration drilling program was undertaken jointly by The Department of Mines and Energy (MESA) and ETSA Corporation (ETSA) over areas considered prospective for coal within the vicinity of the existing infrastructure of the Leigh Creek...-
Document
Published: 01 Jun 1996
-
RB 96/00025 Exploration for coal in the Coober Pedy area, South Australia.
As part of the Government's South Australian Exploration Initiative (SAEI), and in support of the South Australian Steel and Energy (SASE) Project, a small coal exploration program was initiated by MESA to investigate a number of subtle magnetic lows...-
Document
Published: 01 Sep 1996
-
NERDDC Project 590 : [ Research into the feasibility of ] Underground gasification of [ mining inaccessible ] Leigh Creek coal. Reports on field investigations and geotechnical studies.
During the first few months of 1985, field investigations were undertaken at Leigh Creek by consultants Golder Associates to provide quantitative data on the strength and permeability characteristics of the geological profile of the Main Series coal...-
Document
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
Arckaringa [North-east]. Annual reports to licence full surrender, for the period 13/4/2005 to 3/6/2014.
An area of 185 square km was taken up by SAPEX to allow it to evaluate afresh known sub-bituminous coal measures in the Permian Mount Toondina Formation that constitute the East Wintinna coal deposit. This deposit had been discovered by Meekatharra...-
Document
Published: 11 Jul 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Camel Lake. Annual reports to licence surrender for the period 16/11/2012 to 15/11/2023.
An area located ~ 70 km north-east of Ooldea Siding and 50 km east of Maralinga is being explored for the industrial mineral kaolin, and more particularly its crystallographic form halloysite, which typically occurs as microtubules or nanotubes which...-
Document
Published: 21 Nov 1923
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Wintinna Hill, Welbourn Hill Homestead, South Neales River and Mount Willoughby Homestead. Joint progress reports to licences' joint full surrender, for the period 11/11/1986 to 10/11/1987.
An extensive review was undertaken of the potential of the eastern Officer Basin area extending 50-150 km west of Oodnadatta for hosting buried native sulphur deposits in association with salt dome structures, but the recommended follow-up exploration...-
Document
Published: 20 Jan 1988
-
Lochiel coal deposit. 1984 bulk sampling geological report.
A large diameter coring programme obtained a bulk coal sample for combustion testing from two sites within the coalfield. The major portion (227 tonnes) represented "average " quality coal from the proposed mining area, while a poorer quality...-
Document
-
Big Lake 22. Test reports.
There is no abstract created for this record-
Document
-
Lithologs and coal analyses of lignites and lignitic clays sampled from fifteen holes drilled in the eastern Eucla Basin.
There is no abstract created for this record-
Document
-
Big Lake 24. Test reports.
There is no abstract created for this record-
Document
-
Kingston (South-East). Progress reports [until the commencement of WMC's Kingston Coal Project multi-licence joint reporting, approved from 1/5/1980] for the period 21/8/1979 to 20/2/1980.
Continuing reconnaissance and evaluation of potentially economic Tertiary or Jurassic age coal seams, both known to be present in the Naracoorte and Kingston areas, has consisted of the drilling and geophysical logging of 92 open rotary holes...-
Document
-
Big Lake 25. Test reports.
There is no abstract created for this record-
Document
-
Big Lake 23. Test reports.
There is no abstract created for this record-
Document
-
RB 26/00118 Gibraltar pyrite deposit near Nairne, SA.
Ideal location - 26 miles from Adelaide - good climate. 3½ miles from Nairne on Adelaide-Melbourne railway line. Electric supply to Nairne-Power requirements could probably be obtained from supply company. Small flow permanent water beside deposit,...-
Document
Published: 15 Nov 1949
-
Moorlands. Progress reports and final report to licence expiry/renewal, for the period 10/9/1976 to 9/9/1978.
Work consisted of gathering all available information and advice on, and assessing the problems associated with, treatment of the Moorlands deposit low rank brown coal to make it a fuel suitable for use in cement manufacture within a newly constructed...-
Document