Data release - as updated [made at SA Director of Mines’ discretion] : Cowell (latterly part of the Cowell JV Project). Annual reports for the period 23/9/2002 to 6/11/2008.
A large licence area, comprising two separate blocks aligned along strike, which cover the northern Cowell Hills and the less elevated country stretching north-east of Lucky Bay, was taken up by Avoca Resources Ltd as part of a much wider search...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Geological mapping and geochemical appraisal of an area extending from Brindana Gorge to Parabarana Hill SMLs 704-705 SA.
There is no abstract created for this record-
Document
Published: 01 Jan 1974
-
Report on semi regional mapping Mount Neill prospect, Nov-Dec 1973, with petrology reports by Pontifex.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-33 - Mount Hope district, south-western Eyre Peninsula, Archaean iron ore mineral prospects. Drilling project final report.
The south-western Eyre Peninsula regional iron ore targeting project has recently been initiated due to the success of Lynch Mining’s previous, in part PACE Initiative - subsidised, exploratory drilling programmes (DPY2-38, January-March 2006 and...-
Document
Published: 11 Nov 1911
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Moolawatana. Progress and technical reports for the period 18/5/1972 to 17/5/1974.
There is no abstract created for this record-
Document
-
Mount Hill (part of the Gum Flat Iron Ore Project). Final report at licence full surrender, for the period 25/2/2008 to 27/8/2015.
A small part of the Lincoln Uplands on east-central Eyre Peninsula, which is centred ~20 km north-east of Cummins, has been explored for possible economic buried graphite and/or base metal mineralisation that may have formed in metamorphosed...-
Document
Published: 22 Jun 1915
-
Morgan. Final report at licence full surrender, for the period 12/4/2007 to 16/7/2014.
After its purchase of the subject EL 5069 on 8/7/2013, a single drilling campaign was undertaken by Iluka Resources during August-October 2013, when 11 RC aircore vertical open holes were drilled for a total penetration of 266.5 m. Ten of the holes...-
Document
Published: 09 Jul 1914
-
Oakbank Dam (part of the Lodestone Project). Final report at licence full surrender, for the period 4/11/2010 to 1/8/2016.
An area centred ~70 km south-southeast of Olary has been explored for buried mineral sands placer deposits that may have formed within the Cainozoic Murray Basin sedimentary cover, as well as for possible economic stratabound iron ore occurrences that...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Wanilla. Annual reports submitted until the commencement of the multi-licence Southern Eyre Peninsula JV Project, for the period 28/10/2004 to 27/10/2006.
A narrow north-south aligned area centred approximately 25 km west-northwest of Port Lincoln, which is mainly covered by Quaternary ferricrete, has been taken up by Centrex Metals Ltd to explore for possible concealed economic deposits of iron ores...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports to licence expiry/renewal, for the period 1/9/2005 to 31/8/2010.
An area centred ~230 km north-west of Ceduna, in the far north-eastern corner of the Nullarbor Plain, and lying just south of the Ooldea railway siding on the Trans Australian Railway line, is being explored for possible economic buried deposits of...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-30 - Trafford Resources Ltd, Wilcherry Hill Project, Oxy's Bore prospect magnetic anomaly IOCG target. Drilling project final report.
Trafford Resources Ltd ('Trafford'), the owner since March 2007 of the seven exploration licences comprising the Wilcherry Hill Project, has as its primary focus exploration of these tenements for economic precious and base metal deposits. The...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports to licence expiry/renewal, for the period 12/4/2000 to 11/4/2005.
No work took place on the renewed licence during its eleventh year to 11/4/2001, while the JV partners were awaiting resolution of six conflicting Native Title claims to the Ooldea area before they could have legal acess to EL 2710 to progress their...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 1912
-
Data release - as updated : South Dam. Annual reports to licence full surrender, for the period 10/12/2009 to 4/11/2020.
A small licence area located on the northern margin of the Murray Basin, approximately 70 km north-east of Burra and about 40 km south of the previously studied Razorback Ridge banded iron formation magnetite deposit, has been explored for possible...-
Document
-
RB 2016/00003 South Australian mineral resource production statistics for the six month [period] ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2009/00018 BHEI 2009 - OLARY field excursion to Ameroo Hill, Tommie Wattie [Bore] and the Walparuta Inlier. [September 25-26, 2009].
The Curnamona Province is the southern remnant of the Palaeoproterozoic Pb-Zn belt, and represents but a small fragment of the original superbasin. Geological data supports the idea of the basin being a rift, with sediments in the Broken Hill Domain...-
Document
Published: 01 Sep 2009
-
RB 2012/00011 South Australian mineral resources production statistics for the six month [period] ended 31st December 2011.
There is no abstract created for this record-
Document
Published: 01 May 2012