RB 84/00058 Progress report: CURDIMURKA 1:250 000 geological map - Cainozoic geology.
Two sandstone sequences, one un-named and one equivalent to the Watchie Sandstone, have been recognized on CURDIMURKA. These sandstone sequences occur beneath the Etadunna Formation. Both are believed to be equivalent to the Eyre Formation. The...-
Document
Published: 01 Sep 1984
-
RB 83/00104 Data base for the Cainozoic of the Lake Eyre Basin, and proposed drilling project with Bureau of Mineral Resources, Geology and Geophysics.
Includes surface and subsurface stratigraphic data, and a geological map at 1:500 000 scale. 18 bores were re-logged.-
Document
Published: 01 Dec 1983
-
RB 79/00114 Palaeodrainage systems in western South Australia. Their detection by Landsat imagery, stratigraphic significance and economic potential.
Two major palaeodrainage systems of Tertiary age, with watersheds of up to 35 000 square km and channel lengths of 200-250 km, have been recognised and delineated using LANDSAT imagery, during 1:250 000 scale geological mapping in western South...-
Document
Published: 01 Jan 1980
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Lake Arthur East, Lake Arthur West and Lake Arthur (the Lake Surprise Project and the Mumpie Project). Data release made in lieu of submitting partial surrender reports : annual and joint annual reports for the period 29/8/2006 to 28/8/2014.
A wide basinal area located east of Marree and bordering the northern Willouran Ranges is being explored afresh for sedimentary uranium occurrences in response to market conditions and the demonstrated prospectivity of the local cover rocks, which...-
Document
Published: 30 Oct 1914
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
Data release - as updated : Lake Frome North (latterly part of The Lakes Uranium JV Project). Annual reports to licence expiry/full surrender, for the period 15/8/2005 to 25/11/2014.
An area on and surrounding the northern third of the Lake Frome salina was taken up to explore for possible economic buried roll front style sedimentary or calcrete-hosted uranium deposits that may have formed within Quaternary and Tertiary sediments...-
Document
Published: 01 Dec 1914
-
Data release - as updated : Security Dam. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
A small licence area located ~30 km north of Cockburn has been being explored for possible economic shallowly buried sedimentary roll front style uranium mineralisation that may have formed within inferred Tertiary fluvial channel sands of the...-
Document
Published: 10 Oct 1917
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Mount Willoughby and Bloods Creek / Vaughan Hill, Mount Algoochinna, Mount Alice and Mount Randolph (the Alberga Diamond Project). Final report on surrendered ELs 2500 and 2502, plus partial surrender report for ELs 2495, 2496, 2498 and 2501.
Diamond exploration in a region north to north-west of Oodnadatta comprised heavy mineral and geochemical sampling over magnetic anomalies selected from aeromagnetic surveys and further defined by ground magnetometry. Certain of this ground was...-
Document
-
Honeymoon Project - pilot wellfield drilling, January-March 1982.
Drilling was undertaken at the Honeymoon deposit, as allowed for under Miscellaneous Purposes Leases 14 and 15 and Retention Leases 10, 11 and 12, located within EL 597. This drilling was carried out as part of the construction of the 6 litre/second...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
Report on Honeymoon deposit coring programme, June 1975 - South Eagle portion of EL 132, SA.
This report summarises the drilling and coring operations conducted during June and July 1975 to obtain representative core samples of the Honeymoon sedimentary uranium deposit. The work was carried out to determine uranium content, associated...-
Document
Published: 21 Oct 1975