-
Tanner Dam. Annual reports and final report to licence expiry/full surrender, for the period 7/6/1996 to 15/10/2002.
The Tanner Dam Project was acquired to explore for concealed structural-related gold mineralisation, and Olympic Dam / Mount Leyshon - type hydrothermal or epigenetic base metal deposits, both associated with Gawler Range Volcanics and Hiltaba Suite...-
Document
Published: 16 Jan 1903
-
Unalla Hill, Moonaree and South Lake Gairdner (Lake Gairdner Project). Annual and final reports for the period 25/10/96 to 24/10/99.
Exploration targeted Olympic Dam style mineralisation associated with Hiltaba Suite intrusives and Gawler Range Volcanics at the southern end of Lake Gairdner, between Mount Ive and Moonaree. Sampling of poorly developed calcrete together with rock...-
Document
Published: 02 Dec 1998
-
Data release - as updated [made at SA Director of Mines’ discretion] : Nonning (latterly part of Terramin's Menninnie Zinc Project). Annual reports for the period 30/3/2006 to 30/11/2012.
An area centred ~70 km north of Kimba, which also lies about 7 km north of the Menninnie Dam lead-zinc-silver deposit, was taken up to explore for possible buried economic volcanic epithermal/hydrothermal Mesoproterozoic Fe-rich Cu-Au mineralisation...-
Document
-
Fiddle Hill. Progress reports to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
TARGET: Olympic Dam style Cu-Au-U mineralisation lying on a linear gravity feature extending south of Lake Macfarlane, which has associated magnetic discontinuities; unconformity - related sedimentary U at the Pandurra Formation/Gawler Range Volcanics...-
Document
-
Kangaroo Bluff (Lake Gairdner area). Progress reports to licence expiry/full surrender, for the period 2/8/1984 to 5/9/1985.
In a search for possible epithermal or sedimentary uranium deposits, plus any base metal mineralisation, in an area located east of Lake Gairdner and approximately 70 km south-west of Woomera, the licensee acquired a 6240 line km airborne...-
Document
-
Charba Hill, Peltabinna Hill and Unalla Hill. Joint progress reports plus joint final report to licence full surrender, for the period 22/12/1989 to 14/11/1990.
TARGET: Possible epithermal gold and base metal deposits associated with volcanic centres; related hydrothermal alteration deposits; and diamonds. EXPLORATION: Regional and follow-up geochemical sampling (gravel, stream sediment and rock chip, plus...-
Document
Published: 10 Dec 1990
-
Eureka Bluff. Annual reports and combined 4th-5th annual/final report to licence expiry/full surrender, for the period 29/11/2005 to 28/11/2010.
An area located 50 km north-northeast of Wudinna, and situated on the southern margin of the Gawler Ranges, has been explored for possible economic deposits of both Olympic Dam style epithermal copper-gold-uranium and Tanami style orogenic lode gold,...-
Document
Published: 28 Feb 1911
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-11 - Renaissance Uranium Ltd, Tanner Dam Project, Gawler Range Volcanics - hosted primary uranium mineralisation, magnetic anomaly targets. Drilling project interim and final reports.
In execution of Renaissance Uranium's approved PACE 2020 Discovery Drilling 2012 project designated DPY7-11, which was partly subsidised by DMITRE to assist in company high-risk high-reward mineral exploration within South Australia, 2 exploratory RC...-
Document
-
RB 2000/00033 Mineral potential of the proposed Gawler Ranges National Park.
In late 1999, the South Australian Government approved the purchase of 1000 square km of land in, and adjacent to, the Gawler Ranges, for the creation of the Gawler Ranges National Park. This land has significant mineral potential, and has been...-
Document
Published: 01 Sep 2000
-
Kangaroo Bluff. Progress reports to licence full surrender, for the period 27/8/1980 to 16/12/1982.
Following the acquisition and interpretation of a semi-detailed aerial magnetic survey, with ground gravity and magnetic surveys follow-up, 4 aircore/diamond drillholes, totalling 508.5 m, and 78 shallow RAB drill holes, totalling 974 m, were drilled...-
Document
Published: 27 Jan 1983