-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Mount Edarteenya (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 70 km east of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has consisted of...-
Document
-
Mount Perrypollkot (part of the Woodmurra Project). First annual report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 80 km east-southeast of Oodnadatta for possible economic, buried Broken Hill or Cannington type Pb-Zn-Ag mineralisation hosted by inferred prospective basement metasedimentary and metavolcanic rocks, has...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 1909
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 1909
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Eaglehawk Dam (part of the Woodmurra Project). Combined first annual/final report to licence expiry/full surrender, for the period 25/11/2015 to 24/11/2016.
An area centred ~70 km south-east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Anna Creek (the Peake and Denison Project). Annual reports to licence expiry/full surrender, for the period 25/10/2019 to 24/10/2021.
A large area centred ~15 km to the south-east of Algebuckina on the Oodnadatta Track has been explored for possible buried economic IOCG type basement-hosted mineralisation, that may have formed within Paleo- to Mesoproterozoic rocks like those...-
Document
Published: 15 Nov 1921
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Data release [made at SA Director of Mines' discretion] : Mount Denison. Annual report for the period 13/3/2015 to 12/3/2019.
A small area centred ~80 km south-east of Oodnadatta is being explored for possible buried economic iron-oxide associated copper-gold-uranium (IOCGU) style mineralisation, as typified by the Olympic Dam and Prominent Hill deposits. The tenement was...-
Document
Published: 12 Mar 1916
-
North-eastern Peake and Denison Inliers. Final report for approved geophysical work programme, Project ADI RD01-094 [part of Accelerated Discovery Initiative Round 1, 2021].
Licenceholder Minotaur Exploration has received a grant of ADI Round 1 subsidy funds from DEM to assist it in understanding the Proterozoic basement geology of the Peake and Denison Inliers, with the aim of making a step-change in the modelling of...-
Document
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
Mount Denison. Progress reports and final report to licence full surrender, for the period 13/5/1991 to 22/3/1993.
Possible economic epithermal/hydrothermal uranium and base metal deposits hosted by Early to Middle Proterozoic meta-igneous and metasedimentary basement rocks in the northern Peake and Denison Ranges were the primary targets addressed by CRA in their...-
Document