-
Mount Allalone. Progress and annual reports for the period 14/6/89 to 31/7/95.
Base metal exploration of two lead-zinc mineralized areas previously discovered by Billiton and WMC within Hutchison Group metasediments near Mt Allalone, northwest of Buckleboo on central Eyre Peninsula, comprised ground magnetic and EM surveys, RAB...-
Document
Published: 02 Nov 1995
-
RB 79/00088 Wilkinson 1. Well completion report.
Wilkinson 1 stratigraphic well was drilled by the SA Department of Mines and Energy in mid-1978, about 250 km south-west of Coober Pedy, in the Tallaringa Trough. Here a thick section of Cambrian claystones, limestones and evaporites, at least 594 m...-
Document
Published: 01 Oct 1979
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Third Plain - Mount Mantell area. Progress and final reports to licence surrender for the period 16/4/1991 to 15/11/1991.
As part of its economic appraisal of the previously discovered Third Plain willemite occurrence, Pasminco conducted a small test gravity survey (69 stations read along three lines 1 km long and spaced 100 m apart) across the mineralised outcrop and...-
Document
-
Beltana. Progress reports and final report to licence expiry/full surrender, for the period 7/12/1990 to 6/10/1992.
TARGET: Possible undiscovered willemite mineralisation near the historic Beltana zinc mine. EXPLORATION: A detailed gravity survey of the mine area, and follow-up percussion drilling (2 holes totalling 150 metres) of the largest and highest magnitude...-
Document
Published: 08 Sep 1992
-
Price. Progress reports to licence expiry/renewal, for the period 24/2/1975 to 23/2/1977.
In continuing regional exploration conducted over north-eastern Yorke Peninsula, further reconnaissance stratigraphic drilling and wireline geophysical logging (in 3 vertical rotary percussion holes totalling 373 m) was carried out in May 1976 to test...-
Document
-
RB 73/00008 Geological survey, Torrens Hinge Zone Project, Bute region. Report no. 1.
This report outlines the history and concept of the Torrens Hinge Zone project. An account is given of the regional geology, geophysics, geochronology and stratigraphic drilling in the Bute region and adjoining areas of northern Yorke Peninsula. An...-
Document
Published: 01 Jan 1973
-
Douglas Creek (part of the Peake and Denison IOCG Project). Annual reports and final report to licence full surrender, for the period 21/9/2000 to 30/4/2010.
Rio Tinto Exploration Pty Ltd (Rio Tinto) took up the subject tenement at Douglas Creek, located ~ 20 km east of the central Peake and Denison Ranges, to explore the Palaeoproterozoic and Mesoproterozoic metamorphic basement rock sequence that it...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress reports and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 1 of 3 ].
Exploration of an extensive area lying to the north of and surrounding Strathalbyn, 40 km south-east of Adelaide, is targeting possible economic stratiform base and precious metals mineralisation hosted within the Cambrian Kanmantoo Group...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bremer. Progress and annual reports to licence expiry/renewal, for the period 8/3/1991 to 7/3/1995. [ Index Part 2 of 3 ].
In May 1992 six traverses of shallow RAB drilling were completed at the Angas prospect (222 holes for a total penetration of 1550 m). The objective was to test the Cambrian bedrock geochemistry beneath shallow Tertiary and Recent sediments that cover...-
Document
-
Aroha. Progress reports and final report to licence expiry/full surrender, for the period 27/5/1980 to 26/5/1982.
As part of Esso's continued exploration programme for buried Late Proterozoic stratiform uranium deposits in the Uno - Corunna area, detailed geochemical, petrological, thermoluminescence and lead isotope studies were performed on samples obtained by...-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Mount Compass (the Finniss River Project). Combined first annual/final report to licence expiry/full surrender, for the period 19/11/1996 to 18/11/1997.
A gossanous bedrock outcrop present within Early Cambrian sediments of the central Fleurieu Peninsula, and situated 16 km north-east of Mount Compass township, was investigated as a possible Mississippi Valley - type (MVT) base metals target....-
Document
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial relinquishment and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 2 of 2 ].
After the signing of a new joint venture agreement for the three Yarramba Project tenements (EL 1004 South Eagle, EL 1352 Strathearn and the subject EL 1060 Mulyungarie) in early 1986, the CSR-led partners began exploration for possible Olympic Dam -...-
Document
Published: 31 May 1991
-
Hiltaba. Progress and final reports for the period 22/6/1972 to 21/6/1973.
Rock chip and stream sediment samples were analysed for U, Th and base metals. In addition, water samples from bores were analysed for U. All assays were low. It was concluded that the Hiltaba Granite has slightly elevated but insignificant levels...-
Document
Published: 17 Oct 1973
-
Carnding. Annual reports and final report to licence full surrender, for the period 18/1/2006 to 22/2/2012.
Three separate small sub-blocks forming a licence in the Tarcoola district have been explored for possible economic buried Tertiary sandstone-hosted uranium mineralisation and for any other metallic mineralisation that may have formed in underlying...-
Document
Published: 29 Feb 2012
-
SP 008 Mineral Resources of the Adelaide Geosyncline
This publication has been compiled from a display prepared for the launch of SADME Bulletin 53, held at the Australian Mineral Foundation on 7 December 1987. The importance and diversity of commodities found in the Geosyncline are highlighted in the...-
Document