-
RB 90/00007 Industrial minerals in South Australia. Current operations and future trends.
Established producers have taken advantage of export opportunities for gypsum, salt and dolomite. New developments include a graphite processing plant at the former Uley Graphite Mine and trial mining of micaceous iron oxide for pigments. Proposals...-
Document
Published: 01 Jan 1990
-
Mikkira (south-west of Port Lincoln). Progress reports to licence expiry/full surrender for the period 2/3/1981 to 27/10/1987.
Exploration for graphite primarily, and secondarily for BIF-associated massive base metal sulphides, in the area surrounding the historic Uley graphite mine situated 15 km west south-west of Port Lincoln, initially comprised an airborne reconnaissance...-
Document
Published: 30 Oct 1987
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Elbow Hill. Information status at licence surrender, for the period 12/4/2013 to 29/5/2014: no work performed.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Rudall. Annual reports and final report to licence expiry/full surrender, for the period 24/5/2012 to 23/5/2017.
A small area centred ~ 19 km west-northwest of Cleve was taken up primarily to explore for possible economic buried graphite mineralisation that might have formed within highly metamorphosed bedrock sediments located adjacent to large crustal...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-42 - Mount Woods Project area, Gawler Craton: assessing the potential for ISGC style mineralisation within the Mount Woods Inlier. Drilling final report
Historically, exploration undertaken for finding Iron Oxide - associated Copper-Gold (IOCG) mineralisation on the eastern Gawler Craton, over the long period since the discovery of the Olympic Dam deposit in July 1975, has targeted positive gravity...-
Document
-
Teetulpa, Wattle Dam and Manna Hill. Progress and final reports for the period 24/3/86 to 23/12/86.
Exploration which was centred on the Teetulpa and Mannahill gold fields comprised intensive geochemical sampling (rock chip, soil, stream sediment, battery slimes and mine dumps) and IP, Sirotem and ground magnetic surveys. Several significant gold...-
Document
-
Mount Gawler. Progress reports to licence expiry/full surrender for the period 27/5/1983 to 26/5/1988.
TARGET: Evaluation of the Koppio and Kookaburra Gully graphite prospects on southern Eyre Peninsula. EXPLORATION: Prospect gridding, 1:1000 scale geological mapping, orientation Max-Min II ground EM surveys, extensive trenching and channel sampling,...-
Document
-
Statement of proposed mining operations and Declaration of Environmental Factors for the Uley graphite mine, South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1988
-
Carpie Puntha and Peterlumbo. Joint second partial surrender report, for the period 14/2/1989 to 13/2/1992. Plus: Carpie Puntha and Waddikee. Joint final report to licences' expiry/renewal, for the period 14/2/1989 to 24/6/1992.
TARGET: Possible commercial Menninnie Dam type stratabound or stratiform base metal deposits in the Cowell - Kimba - Buckleboo region. EXPLORATION: Field reconnaissance and rock chip geochemical sampling of prospective areas identified from...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Verran and Malbrom (the Verran Project, then the Arno Graphite Project). Joint annual reports plus annual report, for the period 29/1/2014 to 28/1/2019.
Two licence areas together covering the hinterland to Arno Bay and Port Gibbon on eastern Eyre Peninsula, and extending as far north-westwards as Rudall, are being explored for economic buried graphite deposits that may have formed in deformed high...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Wirrabara. Progress and final reports to licence expiry for the period 5/9/78 to 4/9/80.
EL 417 Wirrabara was secured by CRA to investigate previously untested aeromagnetic, induced polarisation and resistivity anomalies in the Wirrabara - Charlton area, and a reported kimberlite at Bangor. Work has consisted of: - 3 line km of IP...-
Document
Published: 01 Aug 1980
-
SP 003 Mining in South Australia - A Pictorial History
In recognition of the centenary of Henry Yorke Lyell Brown's appointment as the first Government Geologist for South Australia, and the foundation of the Department of Mines and Energy, aspects of South Australia's colourful and vital mining and...-
Document
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Elbow Hill supplementary area. Information status at licence surrender, for the period 13/6/2013 to 9/9/2014: no work performed.
There is no abstract created for this record-
Document
-
Data release - as updated : Campoona (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 6/8/2007 to 5/8/2016.
The subject licence area, comprising two sub-blocks centred approximately 20 km north-west of Kimba, and which lies within the middle part of the NNE trending Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert...-
Document
-
RB 22/00009 Mineral resources of South Australia and their utilization.
There is no abstract created for this record-
Document
Published: 27 May 1946