Cooyerdoo Station. Progress reports to licence expiry/re-issue as part of another licence, for the period 14/9/1981 to 13/3/1983.
Following the signing of an eighteen month exploration joint venture agreement with Stockdale, farminee Mobil Energy Minerals undertook continuation of the uranium search over the anomalous ground lying east and south-east of Lake Gilles, besides...-
Document
Published: 12 Apr 1983
-
Kimba Gap [South] (part of the Middleback Range Iron Ore Joint Venture Project). Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 17/9/2003 to 16/9/2006.
A small exploration licence area centred approximately 50 km west-northwest of Whyalla, which is mainly covered by Quaternary sediments, has been taken up by the South Australian Iron Ore Group (SAIOG) to explore for possible concealed economic...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 1908
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document