-
Mount Deception (part of the Flinders Ranges Project). Final report at licence full surrender, for the period 14/10/1999 to 27/4/2017.
The surrendered two remnant portions EL 5725 Mount Deception formerly were part of a much larger multi-tenement package which is currently still being explored by Perilya, primarily looking for economic stratabound zinc silicate mineralisation similar...-
Document
Published: 21 Jun 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurelia Diamond Project. Joint annual reports for the period 1/1/2014 to 17/11/2018.
Since taking over ownership of five licences that previously formed parts of Flinders Mines' Springfield Project, by a purchase agreement that took force in June 2014, Diamond Resources has been working to define, identify and prioritise advanced...-
Document
Published: 31 Dec 2018
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 2001
-
Coober Pedy south-east - Mount Brady Mafic Intrusive Complex exploratory drilling programme. Final report, Project ADI RD02-293 [part of Accelerated Discovery Initiative Round 2, 2022].
In an area centred ~40 km south-east of Coober Pedy, following its processing of open file GCAS aeromagnetic data (Region 8A/8B) using Vector Residual Mag Intensity (VRMI) and high frequency residual gradients, the licensee had identified two untested...-
Document
Published: 30 Jun 2022
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-10, Watraba (eastern Eucla Basin) heavy mineral sands prospect. Project final report.
This partly PACE-funded drilling project aimed to discover a heavy mineral sand deposit along the eastern margin of the Eucla Basin in the EL 3363 Watraba project area, located 40 kilometres north to north-west of Ceduna. Drilling tested an...-
Document
Published: 18 Dec 2006
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 2013
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Cocata and Warramboo (part of the Eyre Peninsula Project). Reports for the period 7/6/1996 to 8/2/2017.
There is no abstract created for this record-
Document
Published: 01 Jun 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 2009
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 2019
-
Moomba 16, Moomba 17, Moomba 20 and Moomba 23 areas (part of the Sturt Joint Venture Project). Combined first partial surrender report, for the period 25/2/2008 to 31/12/2013.
Majority portions of four licences from a large, multi-licence acreage package that is centred on the Moomba gas processing plant have recently been relinquished owing to the exit of a joint venture partner from the project exploration consortium,...-
Document
Published: 30 Apr 2014
-
Western Gawler Project. Final report, Magneto Telluric, Passive Seismic and Magnetic Modelling Study. Project ADI RD02-296 [Accelerated Discovery Initiative Round 2, 2022].
This report summarises geophysical studies conducted by Western Areas between October 2021 and October 2022, under the ADI Agreement ADI: RD02/296-GP Magneto Telluric (MT), Passive Seismic and Magnetic Modelling Study. The discovery of magmatic Ni-Cu...-
Document
Published: 06 May 2023
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 2018
-
Whichelby (part of the Poochera Kaolin Project). Final report at licence expiry/full surrender, for the period 18/9/2012 to 17/9/2022.
The Great White Kaolin Project (previously the Poochera Kaolin Project), until recently, comprised four Exploration Licences operated by Andromeda Industrial Minerals Pty Ltd, namely, EL 6096 Whichelby, EL 6202 Mount Hall, EL 6426 Mount Cooper and EL...-
Document
Published: 03 Dec 2022
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 2017
-
Lake Gilles district (the Barna Joint Venture). Annual reports to licence full surrender, for the period 15/3/1993 to 12/7/2000.
Exploration of mainly buried Proterozoic metasedimentary bedrock for possible Broken Hill type Pb-Zn-Ag mineralisation and for Olympic Dam type Cu-Au mineralisation has been performed over two separate areas located 25 km north-east and 50 km east of...-
Document
Published: 11 Aug 2000
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 2018
-
Cultana. Annual reports to licence expiry/full surrender, for the period 13/9/2012 to 12/9/2017.
An area centred ~50 km south-west of Port Augusta has been explored for possible economic buried VHMS or porphyry style copper mineralisation and for primary uranium mineralisation hosted by basement rocks within this part of the southern portion of...-
Document
Published: 28 Nov 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Roopena area . Annual technical report for the period ending 11 December 2018.
EL 5898 is an area of 155 km2 located in the Roopena area of South Australia approximately 10 km northwest of Whyalla on 1:250,000 Map Sheet: Port Augusta (SH5304) and Whyalla (SH5308). Works within EL 5898 have targeted predominantly IOCG-style...-
Document
Published: 12 Dec 2018
-
Pureba Conservation Park, Nunnyah Conservation Reserve, Koolgera Conservation Reserve, Jellabinna, Ooldea South and Ooldea Range (part of the Eucla Basin Project). Joint first partial surrender report, for the period 27/10/2004 to 31/1/2009.
Exploration for possible economic heavy mineral sands carried out by Iluka Resources within the now relinquished portions of its multi-licence acreage has comprised aircore drilling of the Cainozoic sedimentary sequence (173 holes for a total...-
Document
Published: 31 Jan 2009