-
AnnRep 1953 South Australia. Annual report of the Director of Mines and Government Geologist for 1953.
There is no abstract created for this record-
Document
-
RB 2008/00016 Review of the Burra Mine Project, 1980-2008 - a progress report.
The Burra (Burra) Mine, situated 150 km north of Adelaide within the Adelaide Geosyncline, produced 2.7 million tonnes of copper ore in two major mining phases - 1845-1877 and 1970-1981. The first phase was initially progressed by underground...-
Document
Published: 01 Jan 2009
-
Burra mine 3D model (3D pdf version).
The Burra mine 3D model was constructed using a georeferenced version of the original hand-drafted base map, which included elevation data points surveyed during the final phase of mining. These elevation locations and associated height data were...-
Model
Published: 27 Jan 1909
- PDF,
- ZIP
-
Burra mine 3D model. Data package.
The SADME 1980-1981 Burra mine field mapping project was undertaken at short notice, in order to collect unique geological data and location survey information from the lower benches of the then actively worked open pit mine, before the newly exposed...-
Model
Published: 18 Sep 1912
- PDF,
- ZIP
-
IS ER008 Field guide for the environmental assessment of recently completed seismic lines in the Cooper Basin and Arid Regions, South Australia.
The Department for Energy and Mining (DEM) has a responsibility to regulate geophysical operations in South Australia’s petroleum provinces. Energy resource exploration and development activities in South Australia are undertaken pursuant to the...-
Document
Published: 01 Aug 2024
-
IS ER006 Field guide for the environmental assessment of abandoned petroleum wellsites in the Cooper Basin, South Australia.
Criteria for assessing the restoration of decommissioned petroleum well sites in the Cooper Basin, South Australia, have been chosen in conformation with two guiding environmental objectives, namely, the degree of success in establishing long-term...-
Document
Published: 01 Aug 2024
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010
-
Yednalue. Second partial surrender report, for the period 29/4/2001 to 8/5/2014.
Early during licence Year 13, two separate portions of EL 4935 together totalling 46 square km or 83.6% of the licence's former area have been relinquished due to the chance of discovery there of gold and base metals by a small, self-funded explorer...-
Document
Published: 25 Mar 1914