-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-44, eastern Eyre Peninsula, Glensea & Franklin gravity targets representing inferred Proterozoic mesothermal/metamorphic basement uranium prospects. Final report.
PACE Initiative Year 5 funding for exploratory drilling was granted to Stellar Resources under its proposal DPY-5-44 for a project designed to test geophysical targets within EL 3978 which were interpreted / inferred to represent alaskite units...-
Document
-
Myola. Annual reports and final report to licence full surrender, for the period 8/11/1996 to 29/7/2003.
Palaeoproterozoic gold, copper and base metal occurrences were the targets of exploration in an area surrounding the Iron Baron mine that, in a tectonic sense, incorporates parts of the Cleve, Middleback and Moonta Subdomains. Regional calcrete...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Midgee (latterly part of the Cowell JV Project). Annual reports for the period 26/11/2003 to 24/3/2019.
An area of the northern Cowell Hills was taken up to explore for possible economic basement-hosted copper-gold mineralisation of epigenetic style, analogous to that found at the Ernest Henry deposit, which may be associated with magnetic anomalies and...-
Document
Published: 08 May 1919
-
Bull 033 The Geology and Iron Ore Resources of the Middleback Range Area
This report deals comprehensively with the physiography, prospect geology, and ore genesis, and includes an assessment of the iron ore reserves and other mineral resources of an area which has been almost the sole source of the iron ore used in...-
Document
-
RB 2001/00006 Reconnaissance sampling of basement rocks of the Gawler Craton, South Australia, for dimension stone.
Eighty-five sites of crystalline basement rocks on the Gawler Craton were inspected to determine which lithological or stratigraphical units have potential for use as dimension stone. The Gawler Craton contains a variety of rock types including...-
Document
Published: 01 Oct 2000
-
Minnipa area. Surrender report for the period 12/8/94 to 22/6/95.
Reconnaissance for commercially viable granite dimension stone, over an area located north-east of Minnipa, indicated that the outcrops had a marked variability in deleterious properties, particularly fracturing. Direct core sampling of the granite...-
Document
Published: 01 Jan 1995
-
Ironstone Hill. Annual reports to licence expiry/full surrender, for the period 11/8/1997 to 10/8/2000.
An airborne magnetic/radiometric survey and surficial calcrete, soil and MMI sampling targeted Challenger/Tunkillia-type gold and Olympic Dam style copper-gold, associated respectively with a number of shear zones and with the Charleston Granite,...-
Document
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
Lake Gilles. First partial surrender report, for the period 16/4/1993 to 15/3/1995.
Following the acquisition and interpretation of semi-detailed airborne magnetic data, ground inspections carried out on magnetic targets 50 km east of Kimba found them to be related to jaspilite formations. No base metal or gold anomalies were...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017