Yaninee. Annual report and final report to licence expiry/full surrender, for the period 16/1/2014 to 15/1/2016.
An area extending for 40 km to the west and south of Wudinna was taken up by Minotaur to evaluate the economic potential of known but poorly defined occurrences of the industrial minerals gypsum and alunite. The company's office-based compilation and...-
Document
-
Erudina Station. Progress reports and final report to licence expiry/full surrender, for the period 20/7/1981 to 19/7/1982.
An area located south-west of Lake Frome, which it was thought might be tectonically analogous to the Torrens Hinge Zone, but developed on the opposite side of the Adelaide Geosyncline, has been explored for possible economic Mount Gunson or Olympic...-
Document
Published: 30 Sep 1982
-
Heartbreak Bore (part of Afmeco's Tarcoola Joint Venture Project). Progress reports and final report to licence expiry/full surrender, for the period 16/1/1980 to 15/1/1982.
Portions of regional airborne radiometric and magnetic surveys, plus a small part of the HW-IV seismic refraction traverse, and 20 line km of gravity and ground magnetic surveys, were undertaken by joint venture operator Afmeco as part of its Project...-
Document
-
Hermitage Creek. Progress and annual reports for the period 22/7/1995 to 23/11/2000.
An area prospective for major metalliferous mineralisation at depth was identified at the intersection of the G2 and G7 structural corridors, 8 km south-west of Rhynie. Its potential was enhanced by coincident gravity, magnetic, radiometric and...-
Document
Published: 02 Jan 1901
-
Pernatty Lagoon. First partial surrender report at licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Exploration conducted by CSR Ltd for possible economic stratiform base metal deposits in the western part of EL 81 addressed several targets, including Cattle Grid type disconformity - related copper mineralisation, Sweet Nell / MG14 type...-
Document