-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017
-
RB 2023/00036 Connecting the cover to the basement in the central-western Gawler Craton
The ‘Connecting the cover to the basement in the central-western Gawler Craton’ project is part of the Geological Survey of South Australia’s ‘Gawler Phase 2 (GP2): Next Generation Mineral Systems Mapping’ project. The project aims to contribute to...-
Document
Published: 01 Aug 2023
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA, SG 53-14.
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
ExpNotes CURDIMURKA: Explanatory Notes CURDIMURKA, SH 53-08.
There is no abstract created for this record.-
Document
-
ExpNotes COPLEY: Explanatory Notes COPLEY, SH 54-09.
There is no abstract created for this record.-
Document
-
ExpNotes MARREE: Explanatory Notes MARREE, SH 54-05.
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document