-
Yarramba. Progress reports to licence expiry/renewal, for the period 13/5/1971 to 12/5/1972.
Continuing intensive exploration for economic sedimentary uranium deposits within buried Tertiary palaeochannel sediments in the Yarramba Homestead area, 50 km north-west of Cockburn, which had been invigorated by the recent discovery of strongly...-
Document
-
Preliminary evaluation of in situ leaching on MTA [Minad-Teton Australia's] uranium deposits in the Lake Frome area, SA.
In-situ leaching of a uranium orebody can only be successful if the deposit meets a number of essential criteria. These criteria are: 1. The ore occurs in a generally porous and permeable horizontal bed underlain and overlain by impermeable strata;...-
Document
-
Continuous solvent extraction studies.
Work carried out at Amdel and at the Colorado School of Mines' Research Institute has indicated that both a two solvent system (EHPA and TBP or DBBP) and a three solvent system (EHPA, DBBP and Alamine 336) of cationic exchangers are satisfactory for...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
South Eagle. Progress and technical reports for the period 21/12/1977 to 2/11/1984.
TARGET: Ongoing evaluation of the Honeymoon deposit. EXPLORATION: Pilot wellfield drilling (48 holes) on a 60 m by 30 m grid over the eastern half of the deposit, hydrological investigations, metallurgical testing, and in-situ push-pull leaching...-
Document
Published: 10 Nov 1984
-
RB 00032 Radium Hill ore dressing. Progress report no. 11.
Tests included flotation tests with salt water and wet magnetic separation on newe 10 ton bulk sample from Brown shaft.-
Document
-
RB 00018 The effect of ferric iron on uranium adsorption efficiency and quality of product, using ion exchange resin IRA 400.
Experiments carried out on ion exchange adsorption of uranium, from sulphuric acid leach liquors of Radium Hill ores, have demonstrated that ferric iron in the liquor has a detrimental effect on adsorption efficiency and on the quality of the product.-
Document
Published: 01 Dec 1900
-
RB 76/00007;Amdel 00093 In situ uranium leaching - Laboratory testing. Stage 1.
Analytical and mineralogical work carried out on core from 4 drill holes show deposit is suitable for in situ leaching. Alkaline leaching using ammonium carbonate is preferred.-
Document
Published: 01 Nov 1976
-
Olympic Dam deposit (located within the Olympic Dam Mining Feasibility Project Joint Venture Area on Andamooka EL 536 and its successors). Exploration progress reports issued until the grant of a SML, for the period 17/11/1979 to 9/5/1986.
The subject quarterly reports record primarily the progress and results of surface and underground exploratory drilling designed to define the Olympic Dam orebody. Further brief comments are provided about the establishment of mining and mineral...-
Document
-
RB 2004/00010 Port Pirie Treatment Plant. Management plan Phase 1 - preliminary investigation 2004
This report is Phase 1 of a management plan for the former Port Pirie Uranium Treatment Plant site, and is essentially a preliminary investigation to establish a greater understanding of the characteristics of the site. Phase 2 will follow on from...-
Document
Published: 01 Jul 2004
-
SADM / Amdel Project 1/1/15 : Crocker Well and Mount Victoria uranium ore concentrate. Recovery of valuable constituents [uranium and thorium]. Final report.
An investigation has been conducted into the leaching of Crocker Well ore concentrates and the recovery of uranium and thorium from the leach liquor. Approximately 90% of the uranium and 80% of the thorium can be extracted from the concentrates by hot...-
Document
-
SADM/Amdel mineral research Project CM 1/1/184 : "Rare earths from Port Pirie tailings dams". Progress and final reports on Stages 1 and 2, for the period December 1975 to February 1977.
Tailings remaining after the crushing/acidic leach treatment of uranium-bearing davidite ore from the Radium Hill mine, which are held in six clay-lined containment ponds ('dams') at the now disused Port Pirie ore treatment plant, have been studied to...-
Document