-
RB 57/00096;Amdel 00289 Beneficiation of Warramboo drill core.
There is no abstract created for this record-
Document
Published: 01 Jan 1963
-
RB 58/00057 Progress report no.3 - Investigation of Dawesley aeromagnetic anomaly.
A third diamond drill hole was completed to a depth of 175m at the Dawesley anomaly. It intersected micaceous siltstones, greywacke and schists of the Kanmantoo Group. No significant mineralisation was encountered.-
Document
Published: 01 Jan 1964
-
RB 59/00006;Amdel 00328 Davis tube testing of iron ores.
Determination of the magnetic iron content of ores has normally been made by means of the Davis tube. Examination of a Billeroo iron ore, which contained a high proportion of martite, gave misleading results (a) (AMDL-175). This project was therefore...-
Document
Published: 01 Jan 1957
-
RB 60/00042 Investigation of iron formations in the Mulgathing district.
Detailed geological mapping has identified a metamorphosed iron formation though to be equivalent to the Middleback Group of Eyre Peninsula. Four diamond drillholes have given complete intersections of the Mount Christie, Fingerpost Hill and George...-
Document
Published: 04 Mar 1965
-
RB 60/00048 Ground magnetic and gravity survey of the Warramboo aeromagnetic anomaly, central Eyre Peninsula. Geophysical report no. 1.
The project followed a logical appraisal, from conducting high level aeromagnetics through low level aeromagnetics, ground geophysics, drilling and shaft sinking, to metallurgical testing. All geophysical methods used divide the anomaly into three...-
Document
Published: 16 Mar 1965
-
RB 60/00054 Geological report no. 1 on the Oolanta anomaly, Hd Stokes, southern Eyre Peninsula (Cummins and Tumby 1-mile sheets).
10 miles north-west of Tumby Bay, a syncline of jaspilite, with a shallow southerly plunge, could contain 8-13 million tons of magnetic iron ore per vertical 100 feet. Unweathered jaspilite with magnetite occurs. Assessment of the potential of the...-
Document
Published: 16 Mar 1965
-
RB 49/00001 Supplementary gravity traverses over Bungalow aeromagnetic anomaly near Cowell, Eyre Peninsula.
Supplementary gravimeter traverses have been run over the strong Bungalow aeromagnetic anomaly to further define it. Earlier in the year a percussion drilling programme was carried out over the same area. In the light of both sets of results it is...-
Document
Published: 03 Jul 1959
-
RB 44/00045 Iron King magnetite deposit.
There is no abstract created for this record-
Document
Published: 01 Jan 1959
-
RB 44/00089 Report on diamond drilling of a magnetic anomaly at Weetulta, Yorke Peninsula, secn 201 Hd Tiparra, Co. Daly.
Two angle diamond drillholes (totaling 1062 feet) were put down on a site of an anomaly detected during an aeromagnetic and ground magnetic survey. It was hoped that copper mineralisation may be located. A magnetic zone 80 feet wide and dipping 65...-
Document
Published: 01 Jan 1957
-
RB 42/00015 Ground magnetometer investigations, Glenorchy Kalabity area.
Ground magnetometer surveys were carried out by the writer over typical portions of the geomagnetic anomalies located at the North Billeroo dam area and adjacent to the Alconie dam to determine their cause. Inspection of these areas showed that the...-
Document
Published: 01 Jan 1957
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
RB 97/00008 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Regional bedrock drilling 1995.
Following the acquisition and interpretation of 435 line km of ground magnetic surveys over selected aeromagnetic anomalies within regions of high magnetic relief on the northern Gawler Craton, 121 reverse circulation holes totalling 8609.25 m were...-
Document
Published: 01 Jan 1997
-
RB 97/00002 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Sequoia, Gina and Wirrida prospects.
As part of the South Australian Steel and Energy Project, MESA has explored several significant aeromagnetic anomalies to try to find a possible iron ore resource. The Sequoia, Wirrida and Gina magnetic anomalies were chosen as indicating...-
Document
Published: 01 Feb 1997
-
RB 97/00001 South Australian Steel and Energy Project. Coober Pedy iron ore investigation. Summary report.
Mines and Energy South Australia, as part of its contribution to the South Australian Steel and Energy Project, has defined an iron ore resource in the Coober Pedy region. Extensive ground magnetic, gravity and drilling programs identified four...-
Document
Published: 01 Dec 1996
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Lake Moolkra. Annual and final reports to licence expiry/full surrender for the period 24/5/2002 to 21/2/2006.
No field work was performed over a small licence area located approximately 40 km east-southeast of Tarcoola, where an E-W elongated intense magnetic anomaly corresponds to a low hill of outcropping banded iron formation with an eastwards extension...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907