-
Data release - as updated : Lake Frome South. Annual reports to licence expiry/full surrender, for the period 9/5/2005 to 25/11/2015.
A large area centred ~110 km north-northwest of Olary and lying adjacent to the south-eastern margin of Lake Frome has been explored initially for buried sedimentary or calcrete type uranium deposits that may have formed in Pleistocene and Recent...-
Document
Published: 26 Nov 2015
-
Oolgelima Creek. First annual report plus final report to licence expiry/full surrender, for the period 31/8/2012 to 30/8/2014.
Three separate small areas on the eastern edge of the Stuart Range, that are located 30 to 45 km north and north-east of Coober Pedy, have been explored both for possible buried Proterozoic basement-hosted IOCG-style mineralisation and for large...-
Document
Published: 10 Oct 2014
-
Kielpa (part of the Cowell Project). Annual reports and final report to licence expiry/full surrender, for the period 5/12/2005 to 20/3/2014.
An area centred about 25 km west of Cleve has been explored for possible buried Athabasca Basin type unconformity - style uranium mineralisation, which it was thought might have formed in a fairly deep (> 200 m) geological setting where...-
Document
Published: 18 Jun 2014
-
Yellabinna. Annual reports and final report to licence expiry/full surrender, for the period 9/5/2005 to 10/10/2013.
An area with poor basement outcrop located approximately 110 km north-east of Ceduna and 40 km south-west of Tarcoola, which lies wholly within the eastern part of the Yellabinna Regional Reserve, is being explored primarily for possible economic...-
Document
Published: 28 Oct 2013
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 2009
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 2021
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 2012
-
Midgee. Fourth partial surrender report, for the period 26/11/2003 to 24/3/2017.
Portions of two of three separate sub-blocks formerly comprising EL 5426, totalling 34 square km in area or ~25% of the licence's former extent, have been relinquished because of their now perceived diminished prospectivity for finding significant...-
Document
Published: 15 Feb 2017
-
Midgee. Fifth partial surrender report, for the period 26/11/2003 to 24/3/2019.
Portions of the western sub-block of EL 5426, totalling 27 square km in area or 27% of the licence's former extent, have been relinquished because of their now perceived diminished prospectivity for finding significant occurrences of uranium...-
Document
Published: 01 Feb 2019
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 2010
-
Primrose Hill. Annual and final reports to licence expiry/full surrender for the period 13/8/2007 to 12/8/2009.
Exploration of an area located approximately 60 km north of William Creek, looking for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within inferred concealed Proterozoic basement east of the Peake and Denison...-
Document
Published: 12 Oct 2009
-
Peltabinna Hill. Annual reports, plus final report to licence expiry/full surrender, for the period 2/5/2013 to 1/5/2017.
An area located along the south-south-western margin of the Gawler Ranges volcanic province has been explored for possible economic buried copper-gold and/or base metal mineralisation which might have been emplaced during the early stages of the...-
Document
Published: 29 May 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Brady. Annual reports to licence expiry/renewal, for the period 25/1/2010 to 24/1/2015.
An area centred over the central Coober Pedy Ridge tectonic feature, 28 km east-southeast of Coober Pedy township, is being explored for possible economic buried massive haematite and magnetite within banded iron formation (BIF) type iron ore...-
Document
Published: 05 Mar 2015
-
Lake Cadibarrawirracanna. First annual report plus final report to licence expiry/full surrender, for the period 31/8/2012 to 30/8/2014.
An area centred over Lake Cadibarrawirracanna, which is located ~70 km east-northeast of Coober Pedy, has been explored both for possible buried Proterozoic basement-hosted IOCG-style mineralisation and for large sedimentary evaporite occurrences of...-
Document
Published: 10 Oct 2014
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 2018
-
Coomandook, Kingston (South-East), Padthaway and The Coorong [East] (the Padthaway Project). Joint annual reports plus final reports to various licences' respective full surrenders, for the overall period 27/3/2014 to 26/3/2019.
A group of semi-contiguous licence areas in the Padthaway district, and one somewhat removed to the north-west, near Coomandook, have been explored for possible buried economic volcanogenic massive sulphide (VMS) style mineralisation that may have...-
Document
Published: 08 May 2019
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Data release - as updated : Mount Nott. Annual reports to licence expiry/full surrender, for the period 17/1/2012 to 16/1/2019.
An area located ~100 km north-west of Kimba, on the southern margin of the Gawler Ranges, is being explored by Investigator Resources for a variety of styles and types of precious and base metal epithermal mineralisation that may have formed in...-
Document
Published: 26 Mar 2019
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 2017