Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
Woomera, Portulacca Ridge and Red Lake. Joint final report at licences' joint full surrender, for the period 15/2/1983 to 7/11/1986.
The three licences now being surrendered were originally taken out by Seltrust in the mid-1970s to search for stratabound base metals and Olympic Dam type mineralisation. After Seltrust withdrew from the subsequently formed Stuart Shelf joint venture...-
Document
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Mount Gunson. Progress reports and final report to licence expiry/renewal, for the period 5/8/1977 to 4/8/1979.
In a search for possible economic repetitions of Cattlegrid and MG14 - style copper sulphide mineralisation, or for any buried analogues to Western Mining Corp.'s recently discovered copper deposits on Roxby Downs Station, ongoing exploratory work...-
Document
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document