-
Bendigo Station. Progress reports to licence expiry/renewal, for the period 6/8/1987 to 5/8/1992.
Copper and gold exploration comprising outcrop, stream sediment and soil geochemical sampling, and the conduct of ground magnetic and IP surveys, plus RC percussion (67 vertical holes, total 6624 m) and diamond cored tail drilling (in 2 holes, total...-
Document
Published: 02 Jul 1992
-
RB 60/00091 Diapirism in the Adelaide Geosyncline.
During the Neoproterozoic Willouran Epoch, a thickness of approximately 20,000 feet of Callanna Beds were deposited under shallow water conditions in the western zone of the Adelaide Geosyncline. Diapirs were produced by the lower Callanna sequences....-
Document
Published: 07 May 1965
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
RB 92/00018 Holdfasts for rock climbers: Morialta Conservation Park.
Holdfasts were installed at Morialta Conservation Park to improve safety for rock climbers. Twenty three rockbolts were grouted into holes drilled into rocks of the Stonyfell Quartzite Formation. Two rockbolts were grouted into cast concrete blocks...-
Document
Published: 01 Apr 1992
-
Geological investigations of clay, mica and sillimanite occurrences at Williamstown, and evolving mine development plans and alternatives. Progress reports for the period 6/10/1976 to July 1984.
Dataset contains Amdel - derived mineralogical and petrological data on the ore and host rocks, plus the mine operator's reports on its plans to resume and optimize production of the unique ore types known to exist in four current mine pits and their...-
Document
-
RB 73/00219 Little Para Dam proposed spillway alignment. Report on geological investigations - EWS Department.
There is no abstract created for this record-
Document
Published: 01 Jan 1973