-
EPMA monazite constraints on the timing of deformation and metamorphism in the southern Kalinjala Shear Zone, Gawler Craton.
In this article we present new EPMA monazite geochronological data from the deformed and metamorphosed Sleaford Complex units at Fishery Bay in the southern Gawler Craton. The results show that these fabrics formed during the development of the...-
Document
-
Green Patch. Progress, annual and final reports to licence surrender for the period 8/7/1991 to 1/3/1996.
Following a review of previous company exploration and image interpretation of SAEI and BMR aeromagnetic data, a 3166 line km airborne magnetic/radiometric survey, with follow-up ground magnetics and air core drilling (282 holes, 4559 m), was carried...-
Document
-
Venus Bay. Annual reports and final report to licence full surrender, for the period 27/7/1994 to 21/12/1998.
Diamonds and base and precious metal exploration undertaken north-east of Port Kenny on western Eyre Peninsula comprised loam sampling for kimberlite indicator minerals, RC drilling (7 vertical holes, total 470 m), plus bedrock petrological, heavy...-
Document
-
Tooligie - Verran, Ungarra and Darke Peake areas, south-eastern Eyre Peninsula. Combined partial surrender report for the period 12/11/1978 to 11/11/1982.
Exploration for unconformity-related uranium deposits has been performed within the subject ELs by Pancontinental Mining on behalf of joint venture partners since 1979. The initial exploration concept was to look for economic deposits occurring at or...-
Document
Published: 15 Nov 1982
-
RB 2016/00030 Mineral Systems Drilling Program in the southern Gawler Ranges, South Australia.
The Mineral Systems Drilling Program (MSDP) was a $3.5M cash and $4.11M in-kind collaborative drill program involving government, researchers, service providers and the minerals industry. The objective of the MSDP was to further the understanding of...-
Document
Published: 01 Sep 2017
-
RB 2020/00006 SHRIMP geochronology of the Mount Double area, Southern Gawler Ranges margin
This geochronological study was undertaken within the scope of the Mineral Systems Drilling Program (MSDP), a program that was aimed at improving the understanding of the geology and prospectivity of the southern Gawler Ranges margin area on northern...-
Document
Published: 01 Oct 2020
-
Data release [made at SA Director of Mines’ discretion] : Cocata and Warramboo (part of the Eyre Peninsula Project). Annual reports and joint annual reports to licences' joint expiry/renewal, for the period 7/6/1996 to 5/6/2001.
Two adjacent licence areas forming part of a contiguous set of project tenements in the central Eyre Peninsula region are being explored by Adelaide Resources (AR) primarily for gold and base metals, which it is thought may occur in buried deposits...-
Document
Published: 28 Aug 2001
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Cocata and Warramboo (part of the Eyre Peninsula Project). Reports for the period 7/6/1996 to 8/2/2017.
There is no abstract created for this record-
Document
Published: 01 Jun 2017
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 2019
-
Central Gawler Gold Province Prospect Scale. Final report, Project ADI RD03-419 [Accelerated Discovery Initiative Round 3, 2022]. CSAMT and Loupe TEM Survey Method Assessment Report, February 2023.
Lady Alice Mines was successful in receiving funding in the third round of The Accelerated Discovery Initiative (ADI). This funding was provided to allow for the assessment of Controlled Source Audio-Magnetotellurics (CSAMT) and Loupe TEM ground...-
Document
Published: 28 Feb 2023
-
The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 2009
-
Moseley Nobs and Uno [West] (part of the Wilcherry Project). Second partial surrenders' respectively combined report, for the overall period 1/11/2014 to 7/4/2021.
14 square km or 35% of the former area of EL 5931, and 3 square km or ~5.2% of the former area of EL 6379, have recently been relinquished due to their now perceived diminished prospectivity for buried base and precious metal mineralisation. Work...-
Document
Published: 17 May 2021
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
RB 2012/00019 Geochemistry of pre-1570 Ma mafic magmatism within southern Australia: implications for possible tectonic settings and timing of major mineralisation events in South Australia.
Geochemical and isotopic data from mantle-derived mafic rocks provide important constraints on our understanding of the composition and evolution of the lithosphere through time. Since the lithosphere is sensitive to tectonic processes such as...-
Document
Published: 01 Dec 2012
-
RB 2012/00010 Geochronology and geochemistry of a Kimban diorite, drillhole LED001, Lake Gilles, eastern Gawler Craton.
The geology of the Lake Gilles locale in the south-west of the PORT AUGUSTA 1:250k map sheet area is poorly understood. Outcrop of basement rocks there is sparse, and typically occurs along the margins of the salt lake, where it is highly weathered....-
Document
Published: 01 Apr 2012
-
RB 90/00001 Explanatory Notes for the KIMBA 1:250 000 geological map.
The KIMBA 1:250 000 geological map sheet (hereafter referred to as KIMBA) lies in central Eyre Peninsula, extending between latitudes 33° to 34° S and longitudes 135° to 136°30'E (Fig 1). The principal towns are Kimba and Cleve, with smaller towns at...-
Document
Published: 01 Dec 1989
-
ExpNotes YARDEA: Explanatory Notes YARDEA, SI 53-03.
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 2014
-
ExpNotes ELLISTON: Explanatory Notes ELLISTON, SI 53-06.
There is no abstract created for this record.-
Document