-
Mount Ive and Corrobinnie (part of the Eyre Peninsula Uranium Joint Venture Project). Joint first partial surrender report, for the period 19/4/2006 to 11/7/2010.
Exploration of the Tertiary Thurlga Palaeochannel for possible roll front type sedimentary uranium mineralisation has occurred principally on EL 3546 Mount Ive, the northern half of which has now been relinquished along with a tiny part of EL 3833...-
Document
Published: 28 Feb 2011
-
Honeymoon Uranium Project. Yarramba Palaeovalley structure and fill geological modelling: deposit brownfields appraisal drilling and downhole geophysical logging. Final Report, Project ADI RD01-100 [part of Accelerated Discovery Initiative Round 1, 2022]
Ongoing exploration presently being conducted in the vicinity of the Honeymoon uranium deposit aims to define and characterise extensions to the Honeymoon resource contained within Mining Lease 6109, by testing target areas located just beyond the...-
Document
Published: 26 Apr 2022
-
Walparuta Project geophysical program: acquisition and interpretation of high resolution airborne magnetic / radiometric and ground gravity surveys. Final report, Project ADI RD02-264 [part of Accelerated Discovery Initiative Round 2, 2022].
This report details the field acquisition and data processing, inversion and interpretation stages of the Walparuta geophysical program conducted in December 2021. The work was focussed on the Walparuta Project area, located 20 km north of Manna Hill...-
Document
Published: 28 Apr 2022
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Frome North. Annual reports for the period 19/8/2013 to 18/8/2016.
An area in the south-west of the Frome Embayment, that is centred ~80 km south-southeast of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium...-
Document
Published: 08 Sep 2016
-
Caralue Bluff. Annual reports and final report to licence expiry/full surrender, for the period 10/1/1997 to 9/1/2002.
Olympic Dam style Cu-Au-U mineralisation associated with Hiltaba age intrusives, and Tennant Creek style Au mineralisation associated with ironstone units in Hutchison Group metasediments, were the targets in the area surrounding the township of...-
Document
Published: 13 Feb 2002
-
Kalanbi. Annual reports and progress reports to licence expiry/full surrender, for the period 26/8/1994 to 25/8/1999.
Ground magnetic surveys were carried out 75 km north-east of Ceduna over an area of masking Tertiary and Cainozoic cover underlain by a basement of Mulgathing Complex and syntectonic Lincoln Complex and Hiltaba Suite granitoids. Drilling of resultant...-
Document
Published: 22 May 2000
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Pernatty [Station] and Yeltacowie (the Punt Hill IOCG Project). Joint annual reports for the period 29/11/2009 to 6/1/2012.
Two adjoining licence areas located in the country east of Pernatty Lagoon that lies between 80 and 180 km north of Port Augusta are being explored by Monax Mining Limited (Monax) for economic Proterozoic basement-hosted Iron-Oxide associated...-
Document
Published: 21 Jun 2012
-
Streaky Bay Lakes. Data release made in lieu of submitting a first partial surrender report at licence expiry/renewal on 18/2/1999: progress reports for the period 19/2/1993 to 18/2/1995.
At the subject licence's Year 6 expiry/renewal on 18/2/1999, a partial relinquishment of 190 square km or ~49.35% of the former area of EL 2489 was effected, in the form of two separate ground portions covering its northern and southern ends. To...-
Document
Published: 13 Mar 2000
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 2006
-
Manguri (part of the Mount Woods Joint Venture Project). Annual reports and final report to licence surrender, for the period 13/12/1999 to 4/10/2006.
Possible craton margin magmatic nickel deposits or iron oxide - associated copper-gold (IOCG) type large base and precious metal deposits within buried Proterozoic basement were targeted in an area lying just to the north-west of Coober Pedy. Delays...-
Document
Published: 20 Nov 2006
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 2007
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 2007
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 2014
-
Clayton, Cooryanna and Lake Eyre (part of the Mount Flint Project). Combined first annual/final report at licences' joint full surrender, for the period 26/3/2008 to 25/3/2009.
Exploration conduced over three semi-adjacent small licence areas located 50-75 km north-east, north and north-west of Marree targeted possible near-surface sedimentary uranium deposits in sandstone palaeochannels, and also sedimentary phosphate rock...-
Document
Published: 01 May 2009
-
Coonalpyn (part of the Coonalpyn Joint Venture Project). Annual reports to licence expiry/full surrender for the period 16/10/2006 to 15/10/2008.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, as well as exploring for base metal mineralisation...-
Document
Published: 13 Nov 2008
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine. Annual reports for the period 13/3/2000 to 1/11/2013.
Exploration Licence 2704 covering 23 square km surrounding the historic abandoned Mutooroo copper mine, located ~55 km east of Olary, was granted to Havilah Resources NL so that the company could assess the economic potential of the remaining sulphide...-
Document
Published: 02 Dec 2013
-
The Musgrave Project. Joint annual reports for the period 5/10/2007 to 31/1/2012 [as later updated, to include additional licences, to 31/1/2017], plus respective successive full surrender final reports for individual licences.
The multi-licence Mithril - Barrick JV Musgrave Project area is centred 600 km south-west of Alice Springs, within the APY Lands of north-western South Australia. It is considered to be prospective for buried economic Ni-Cu-PGE sulphide mineral...-
Document
Published: 09 Oct 2017