RB 81/00099 Stuart Highway, Baker Well to Gosses section. Drilling for construction water.
13 of 38 wells were completed as production wells. Pump testing showed that 6 were capable of yielding 50 kl/day or more for 2 year period. Salinity was in excess of 10 000 mg/L TDS except near Glendambo where water from 4000 to 8000 mg/L was...-
Document
Published: 01 Jan 1982
-
RB 81/00097 Stuart Highway reconstruction, Pimba to Baker Well section. Water well drilling program.
4 of 7 wells were successfully drilled near Wirraminna Rail Siding and should be adequate for highway requirements for compaction water. Groundwater quality in all cases is saline (over 16000 mg/L TDS).-
Document
Published: 01 Jan 1982
-
RB 81/00080 Proposed township near Glendambo. Water supply project.
The area close to well 6036WW122 offers the best site for developing water supply for small town on the Coondambo to Gosses section of the Stuart Highway. Long term yields will depend on the size and frequency of recharge events in a small swamp. This...-
Document
Published: 01 Jan 1981
-
RB 79/00066 Sampling and measurement of mound springs, Great Artesian Basin, South Australia. Progress report no. 3, WARRINA, OODNADATTA, BILLAKALINA, CURDIMURKA sheets.
This report virtually completes a systematic survey of mound springs around the south-western edge of the Great Artesian Basin in South Australia. There are as yet about 20 springs left unsampled, mostly on BILLAKALINA, in the Francis Swamp and...-
Document
Published: 01 Jan 1979
-
Olympic Dam Project : operator's reports on hydrogeological investigations, Great Artesian Basin wellfields, for the period 1995-2004.
There is no abstract created for this record-
Document
-
Dewatering investigations, Lake Phillipson area, South Australia.
An initial investigation programme aimed at obtaining hydraulic data from part of the Lake Phillipson Permian coal field been successfully completed. The initial area under consideration for mining is of approximately 130 hectares within the Western...-
Document
-
Report on preliminary feasibility study of use and mining of coal from deposits in an area near Lake Phillipson, South Australia.
Exploration drilling by Utah Development Co. during 1973 and 1974 in the area covered by EL 125 has outlined at least 2,000 million tonnes of medium quality steaming coal, of a quality considered to be comparable to that for coal from ETSA's Leigh...-
Document
-
Water resources assessment for Lake Phillipson, South Australia.
The Lake Phillipson coal deposits currently under consideration by Utah Development Company as a potential mine, are located in a remote and arid region of Australia. Surface water sources simply do not exist in this area and any development will...-
Document
-
Data release - as updated : England Hill, Arckaringa and Copper Hill (the Arckaringa Coal Project). Joint annual reports and joint final report to licences' expiry/full surrender, for the period 7/6/2005 to 6/6/2019.
Under a new strategic focus, three licence areas covering three Early Permian buried coal deposits located at Wintinna, Westfield and Murloocoppie in the northern part of the Arckaringa Basin, ~120 km north of Coober Pedy, have been evaluated both for...-
Document
Published: 29 Aug 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Phillipson. Annual reports to licence expiry/renewal, for the period 27/4/2000 to 8/8/2010.
During the sixth licence year, on renewed EL 2717 covering the same area as previously, the licensee, now a wholly owned subsidiary of AuIron Energy Limited (formerly Meekatharra Minerals Limited), progressed its investigations of the geology of the...-
Document
Published: 01 Sep 1916
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
RB 72/00192 Tarcoola Alice Springs railway. Report on geological investigations for Long Creek and Mabel Creek Crossings - Commonwealth Railways.
Materials at Long Creek crossing site are adequate for bridge foundations. Less favourable conditions at the Mabel Creek crossing site will require spread footings with low bearing pressures. Local materials at both sites are suitable for approach...-
Document
Published: 10 Oct 1972
-
RB 72/00157 Geological investigations, Tarcoola to Alice Springs railway, Tarcoola to Robin Rise section - Commonwealth Railways.
Geological investigations indicate that no major foundation problems are anticipated. Physical testing shows that most materials are suitable as fill. Saline groundwater is available for compaction but no water suitable for concrete or camp use has...-
Document
Published: 24 Aug 1972
-
RB 74/00012 Commonwealth Railways - Tarcoola-Alice Springs railway (Robin Rise-Wintinna Hill section) progress report no. 5.
During the last drilling programme, six bores were drilled five of which were completed as water productive. The sixth (viz. Bore 30) is to be completed during the next drilling programme. As in progress report no. 4 the drilling target was the...-
Document
Published: 01 Jan 1974
-
RB 74/00178 Oodnadatta town bore 2. Well completion report.
Oodnadatta Town Bore 2 was drilled to supplement the water supply of Oodnadatta, and also to enhance the stratigraphic knowledge of the area. It was drilled to a total depth of 439.48 metres KB, and after pump testing achieved a flow rate of 3.4...-
Document
Published: 05 Sep 1977
-
Wintinna Coalfield hydrogeological and geotechnical study.
This study has formulated a geotechnical and hydrogeological model of the Wintinna Coalfield which satisfies the following objectives: - to provide answers to the hydrogeological and geotechnical questions raised by Fluor in their mining study; - to...-
Document
Published: 05 Dec 1983
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
RB 2013/00011 Geology of the Tieyon 1:100 000 map sheet (5645).
The Tieyon 1:100 000 mapsheet area is located on the South Australia – Northern Territory border in the central Far North of South Australia. It covers rock units of the Mesoproterozoic Musgrave Province, the Mesozoic Eromanga Basin and the Neogene...-
Document
Published: 01 Apr 2013
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009