-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
North Fowlers Bay - Chundaria. Annual reports and progress reports for the periods 15/9/1993 to 14/9/1998, and 28/10/1998 to 12/3/1999.
North Ltd's Barton Project commenced in 1990 across a number of licences progressively taken out over the western Gawler Craton, which eventually came to include EL 1865. Initial exploration for heavy mineral sand in the Barton-Ooldea area, 100-200...-
Document
Published: 06 May 1999
-
Roopena Station. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 26/6/1985.
Exploration of an area situated between Whyalla, Iron Knob and The Bluff overlooking Myall Creek, 20 km south-west of Port Augusta, aimed to test for Olympic Dam - type Cu-U-Au mineralisation associated with products of igneous activity located in and...-
Document
Published: 09 Aug 1985
-
RB 92/00002 Geophysical appraisal of northern Kangaroo Island.
Crystalline basement of the Gawler Craton continues further southwards than previously interpreted, extending under northern Kangaroo Island. Depths to basement range from 200 metres near Emu Bay, and approximately 250-750 metres inland from Cape...-
Document
Published: 01 Jan 1992
-
Wynbring [Siding]. Data release made in lieu of submitting a first partial surrender report upon licence expiry/renewal : annual reports for the period 30/8/2004 to 29/8/2009.
An area located approximately 160 km north-northwest of Ceduna is being explored for possible economic nickel-copper-platinum group metal magmatic mineral deposits, which may have formed within Archaean to Proterozoic basement rocks in a geological...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Streaky Bay Lakes. Data release made in lieu of submitting a first partial surrender report at licence expiry/renewal on 18/2/1999: progress reports for the period 19/2/1993 to 18/2/1995.
At the subject licence's Year 6 expiry/renewal on 18/2/1999, a partial relinquishment of 190 square km or ~49.35% of the former area of EL 2489 was effected, in the form of two separate ground portions covering its northern and southern ends. To...-
Document
Published: 13 Mar 1900
-
Cummins. Annual reports and final report to licence surrender, for the period 10/1/1997 to 16/3/1999.
Thick and often unconsolidated cover sequences of Bridgewater, Uley and Wanilla Formations prevented systematic regolith sampling of much of the area between Wanilla and Peachna, 40 km north-west of Port Lincoln, while no coherent base metal anomalies...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Karkarook. Combined annual and annual reports to licence expiry/renewal/full surrender, for the period 24/6/2004 to 1/9/2014.
A area centred ~ 25 km west of Cleve is being explored for possible buried economic sediment-hosted or basement unconformity - related uranium mineralisation. The tenement covers part of the Driver River and Driver River Pan which contains a...-
Document
Published: 26 Sep 1914
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.
The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...-
Document
Published: 06 Oct 1915
-
Data release [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 17/10/2003 to 19/2/2010.
Paleoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals, and granite dimension stone in an area 40 km south of Kimba. In reporting year 3 for EL 2858, no field work...-
Document
Published: 04 Mar 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Corrobinnie Hill. First partial surrender report, for the period 1/2/1991 to 31/1/1993.
Base and precious metal exploration of the Palaeoproterozoic Hutchison Group in the Corrobinnie Hill area on central Eyre Peninsula has comprised ground magnetic, gravity, TEM and IP surveys, soil geochemistry, and RC drilling (12 holes, total 925 m)....-
Document
-
Cockabidnie North. Annual reports to licence expiry/full surrender, for the period 18/1/2006 to 17/1/2010.
A small (11 square km) area located approximately 40 km south of Kimba has been explored for possible economic uranium, gold or base metal deposits, including Menninnie Dam style lead-zinc-silver mineralisation, that may have formed in Archaean to...-
Document
Published: 12 Mar 1910
-
Data release - as updated : Cockabidnie. Annual reports and final report to licence expiry/full surrender, for the period 31/5/2001 to 13/8/2015.
Early in 2001, Helix Resources Ltd entered into a joint venture agreement with Centrex Resources Limited to allow it to explore for precious and base metals on some of the tenements held by Centrex on the Eyre Peninsula in South Australia, including...-
Document
-
Data release - as updated : Caralue. Annual reports and final report to licence expiry/full surrender, for the period 6/11/2006 to 5/11/2013.
An area centred 40 km west of Kimba has been explored initially for basement gold and nickel mineralisation, and following a joint venture, for possible IOCG and palaeochannel uranium mineralisation. During the first year of tenure, reconnaissance...-
Document
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 1910