-
Glenorchy. Progress reports for the period 3/10/85 to 2/4/87.
An assessment of the uranium and base metal potential of an area located 75 km north of Yunta included the inspection of historic uranium prospects, geological mapping at 1:25,000 scale, rock chip and groundwater sampling, reprocessing of aerial...-
Document
-
Mutooroo. Progress and final reports to licence surrender for the period 5/1/1990 to 9/12/1992.
TARGET: Lead-zinc-silver and copper-gold mineralisation in the Mutooroo area of the Willyama Inliers, 55 km east of Olary. EXPLORATION: Airborne EM surveying (~450 line km flown across strike, 75 Hz, at 300 m line spacing) with ground follow-up moving...-
Document
Published: 04 Jan 1993
-
Trinity mine area. Progress reports to licence expiry/full surrender/re-issue over a much larger area, for the period 23/11/1976 to 22/8/1977.
Base metal exploration over an area situated south of the Barrier Highway, 25 km south-west of Cockburn, consisted of geological mapping, the searching out and sampling of gossans, ground magnetic surveying, and the drilling of 84 percussion holes...-
Document
-
Trinity mine area. Progress reports to licence expiry/renewal, for the period 31/8/1977 to 30/8/1979.
Ongoing exploration for Broken Hill - type mineralisation, across an enlarged licence area extending south and south-west from Cockburn to the edge of the Murraylands, consisted of intensive shallow auger/RAB bedrock drilling of geochemical and...-
Document