-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Walparuta. Progress and annual reports, and final report to licence expiry/full surrender, for the period 6/12/1994 to 20/4/2009.
Ground encompassing the Palaeoproterozoic basement Weekeroo Inlier of the Olary district, which includes the historic Walparuta copper-gold mine located approximately 20 km north of Manna Hill township, was taken out to search for possible economic...-
Document
Published: 28 Aug 1909
-
Geological and geophysical mapping of Billeroo South, Curnamona Province, South Australia.
A semi-detailed geological mapping program has been completed in the Billeroo South area of the NW Olary Block, Curnamona Craton, South Australia. Unlike other areas of the Olary Block, this area had not been previously mapped in any detail except...-
Document
-
Mingary. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1984 to 26/2/1996.
Exploration Licence 1258 "Mingary" was granted to Mount Isa Mines Ltd in November 1984. The area, of 1185 square km lying 40 km north-east of Olary, had been the subject of exploration of the Palaeoproterozoic metasedimentary basement for Broken Hill...-
Document
-
Eurinilla. Data release made in lieu of second partial surrender at licence expiry/renewal : annual reports plus first partial surrender report, for the period 7/6/1994 to 4/7/2001.
The tenement was acquired to cover a large magnetic dome (the Eurinilla Dome, ~100 km north of Olary), considered prospective for iron oxide - associated copper-gold (IOCG) mineralisation analogous to that found at Olympic Dam and Ernest Henry. An...-
Document
Published: 20 Nov 1901
-
Walparuta. Annual reports and final report to licence expiry/full surrender, for the period 21/6/2010 to 20/6/2019.
A small area centred ~30 km west of Olary has been explored for possible economic buried primary stratiform base metal sulphide mineralisation, vein barite mineralisation and also for epithermal copper-gold deposits that may have formed in...-
Document
-
Outalpa Hill. Progress reports to licence expiry/full surrender for the period 16/11/1984 to 1/3/1988.
Exploration for possible economic deposits of massive crystalline andalusite and sillimanite, formed within Palaeoproterozoic Willyama Complex muscovite-quartz schists and gneisses in an area of partly exposed basement north-west of Olary, has...-
Document
-
Kalabity [part of a joint licence area with South Eagle]. Progress and final reports to licence re-issue over a stand-alone area, for the period 13/9/1976 to 12/9/1977.
Continuing exploration for economic stratiform / hydrothermal base metal sulphide deposits in the Kalabity Homestead area, 40 km north of Olary, has comprised detailed geological mapping at 1:20,000 scale, outcrop rock chip geochemical sampling,...-
Document
-
Kalabity. Data release in lieu of partial relinquishment at licence expiry/renewal : progress reports, and successive joint venturers' final reports, for the period 6/10/1978 to 14/3/1988.
This release details exploration conducted between 1978 and 1988 for uranium, base and precious metals in the Early Proterozoic rocks of the Willyama Complex, north of Olary. Initial work on searching for uranium included airborne helicopter...-
Document
-
Benagerie (part of the Benagerie Ridge Joint Venture Project). Progress and annual reports to the commencement of multi-licence joint reporting on the Curnamona Joint Venture Project, for the period 2/5/1989 to 3/5/2003. [Index Part 1 of 3].
An area of sparsely explored, Tertiary and Cretaceous sediment and soil-covered Proterozoic bedrock centred approximately 80 km north of Olary is being explored primarily for base metal massive sulphide deposits. The underlying Benagerie Ridge...-
Document
Published: 19 May 1903
-
RB 2006/00017 Geological notes on the Coppertop, Montstephen, southern Morialpa and southeastern Plumbago Inliers
Four areas on the south-western margin of the Palaeo-Mesoproterozoic Willyama Inliers were mapped in detail to elucidate the nature of their lithostratigraphy, structure and mineralisation. These basement inliers are composed of...-
Document
Published: 01 Dec 2006
-
RB 2004/00008 Geology of the Olary Domain
The aim of this report is to provide a summary of the present status of the geology of the Olary Domain, Curnamona Province. It gives a comprehensive, referenced description of all known interpretations of Willyama Supergroup basement stratigraphy,...-
Document
Published: 01 Feb 2004
-
RB 2002/00036 Draft report on the structure and lithostratigraphy of the Ameroo Hill area, Olary Domain, South Australia
Approximately 30 square km of outcrop of Palaeoproterozoic basement rocks in the vicinity of Ameroo Hill were geologically mapped by the author at 1:10,000 scale, with the aim of identifying meso- and macroscopic rock structures and lithologically...-
Document
Published: 27 Jun 2002
-
RB 2013/00016 A user's guide to migmatites.
Migmatites are complex, high-grade crystalline rocks that have formed by partial melting. They have been recognised within the crustal rock record across most of geological time, are seen to be developed in various tectonic settings, and can affect a...-
Document
Published: 01 Nov 2013
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-19, Honeymoon area base metal and hard rock uranium mineral prospects. Project final report.
EL 2937 licensee Southern Cross Resources has utilised PACE Initiative Year 2 funding assistance to carry out a collaborative drilling project to test 2 primary base metal/uranium targets within Willyama Group basement at a location 5 km south-east of...-
Document