-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Mt Craig Critical Minerals Project. Final report, Project ADI RD03-411 [Accelerated Discovery Initiative Round 3, 2022]. Morgan Creek Prospect Drilling and Geophysics Programs, April 2023.
This ADI funded programme consisted of exploration drilling, geophysics programs and aboriginal employment relating to critical mineral exploration conducted over the Mt Craig Project in the Flinders Ranges of South Australia. ADI funded activities...-
Document
-
Freeling Heights (part of Gunsight Project). Progress and partial surrender reports for the period 7/1/1983 to 6/1/1984.
Evaluation of previous investigations, and geochemical sampling of an Ordovician granite intrusion in the Valley Bore area, particularly for pegmatitic tin-tantalum mineralization, has located only low order anomalous values. Some restricted...-
Document
-
Victory Downs. Progress and final reports for the period 10/6/1968 to 9/6/1970.
Government-prompted company exploration for orthite and related rare earth and other minerals in an area of the eastern Musgrave Ranges included an aerial inspection of quartz pegmatites, plus ground studies and sampling. Geochemical and detrital...-
Document
-
Granite Downs. Progress and final reports for the period 28/8/1969 to 22/10/1970.
Field reconnaissance and assessment of surface mineralisation, regional geological mapping and geochemical sampling, detailed ground magnetic and radiometric surveying, and shallow vertical percussion drilling (5 holes, total 491 feet) were carried...-
Document
Published: 22 Sep 1970
-
Kalkaroo and Benagerie. Final report on an investigation of rare earth element mineralisation in the Benagerie Dome, Project ADI RD01-105 [part of Accelerated Discovery Initiative Round 1, 2021].
The primary objective of the subject successful Accelerated Discovery Initiative (ADI) project proposal has been to determine the nature, extent and economic potential of rare earth elements (REE) mineralisation in the Benagerie Ridge portion of the...-
Document
-
Mount Gee. Progress reports and final report to licence full surrender, for the period 11/5/1990 to 10/12/1993.
Exploration for uranium and associated copper, gold and rare earth elements undertaken in the Mount Painter area comprised the acquisition of a helicopter-borne magnetic and radiometric survey during July 1990, plus the conduct of a stream sediment...-
Document
-
Kalabity - Old Boolcoomata area [= Olary 'A' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
As part of exploration for economic metallic mineral deposits within an area of partly outcropping Precambrian calcsilicate rocks present on Kalabity Station, a field reconnaissance of all known mineralised areas was carried out initially. The...-
Document
-
Mount Norwest (part of the Willouran Ranges Project). Annual reports to licence expiry/cancellation, for the period 8/9/2010 to 7/9/2013.
A search primarily directed at assessing the stratiform copper and magnesite potential of an area centred 50 km south-west of Marree has consisted mainly of office studies comprising the collection and review of open file geoscientific data. Early in...-
Document
-
Data release [made at SA Director of Mines' discretion] : Andamooka (part of the Stuart Shelf Project). Progress reports to licence expiry/renewal, for the period 2/5/1977 to 10/8/1979.
At the commencement of the term of the subject licence, exploratory/appraisal diamond drilling using a single rig was continued on the Olympic Dam gravity anomaly by the licensee for gathering more geological information to use to try to understand...-
Document
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Krystal (part of Edward Creek Project). Annual reports to licence expiry/full surrender for the period 14/2/2002 to 13/2/2005.
Diamond exploration carried out within an area lying to the south-southwest of the Peake and Denison Ranges has aimed to find potential kimberlite sources for nine diamonds, previously recovered by De Beers from surface bulk samples, that were...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document
-
Bob Nob prospect, Mount Painter district. Progress and final reports to claim option relinquishment, for the period 2/6/1968 to 1/10/1969.
Investigation of reported radiometric anomalies associated with sub-economic iron mineralisation at the Bob Nob prospect, which is situated approximately 8 miles north-west of Arkaroola Homestead, has comprised ground magnetics and scintillometry with...-
Document
-
Radium Hill - Mutooroo area. Annual and technical reports for the period 1/3/1969 to 28/2/1971.
There is no abstract created for this record-
Document
-
Report on preliminary follow-up work, Paralana Springs, Carthew Valley, Mount Adams areas June-July 1973, SML 704 South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Plumbago - Glenorchy area [= Olary 'B' Farmin Block]. Progress and final reports to licence expiry/full surrender for the period 10/2/1972 to 9/2/1973.
In a search for possible remaining economic primary or secondary uranium deposits in an area of known such mineral occurrences located around Mount Victoria, a consultant was engaged by Esso Minerals to conduct detailed 1:12,000 scale geological...-
Document
-
Ethiudna [= Olary 'B' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
Exploration carried out mainly to look for possible large primary deposits of uranium ore in localities surrounding Ethiudna Hill initially addressed the potential of several hard rock showings of uranium mineralisation which had been found by...-
Document