Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
Algebuckina. Progress, annual and final reports to licence surrender for the period 4/4/1979 to 3/10/1980.
Four photo-interpreted possible buried kimberlite structural targets that were indicated in the Algebuckina area were investigated by a field programme of drainage and soil geochemical sampling (39 samples) and scintillometric surveying. Three areas...-
Document
-
Nilpinna (part of the Edward Creek Project). Third partial surrender report at licence expiry/renewal, for the period 28/10/1988 to 11/11/2014.
Exploration in a large area located ~120 km south-southeast of Oodnadatta, encompassing Adelaidean sediments and associated intrusive rocks of the Peake and Denison Inliers, has targeted copper and gold mineralisation, while potential for diamonds was...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Warrina. Annual reports and final report to licence expiry/full surrender, for the period 22/3/2006 to 14/11/2013.
Exploration of an area centred 65 km north-east of Coober Pedy has continued from the licensee's previous work aimed at evaluating the IOCG mineralisation potential of Mesoproterozoic basement-hosted, large and regionally significant coincident...-
Document
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-26 - Energia Minerals Limited Gawler Craton Project, IOCG-prospective Blyth Creek BC4 gravity anomaly. Drilling project final report.
During July 2012, at a location approximately 90 km south-east of Oodnadatta, EL 3680 licensee Energia Minerals completed the drilling at the BC4 gravity anomaly target of a single vertical rotary mud/diamond tailed hole to a total depth of 144.3 m...-
Document
-
Peake Creek and Mount Margaret - Nilpinna areas (northern and central Peake and Denison Ranges). Progress reports and combined final report, plus additional data submitted prior to licence full surrender, for the period 1/10/1966 to 31/1/1969.
Regional geochemical surveys have been conducted by North Broken Hill over 490 square miles covering the northern and central Peake and Denison Ranges, within two new exploration licences which the company took up in 1966 after a private prospector...-
Document
Published: 04 Nov 1968
-
Mount Denison. Progress reports and final report to licence expiry/full surrender, for the period 19/11/1973 to 18/11/1974.
As part of a continuing search for possible Palaeoproterozoic unconformity and vein-related hydrothermal uranium deposits in the northern Peake and Denison Ranges basement outcrop region, prospective stratigraphic and structural features were mapped...-
Document
Published: 16 Jan 1975
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 2010
-
Mount Arthur. Progress reports and final report to licence expiry/full surrender, for the period 5/9/1980 to 5/3/1983.
Exploration for possible kimberlite pipes in the Mount Arthur - Mount Toodla area, 30 km east-southeast of Oodnadatta, has included preliminary gravity and ground magnetic surveys, stream sediment sampling, and the drilling of a single diamond cored...-
Document
Published: 09 Jun 1983
-
Nilpinna Spring. Progress reports and final report to licence expiry/full surrender, for the period 12/7/1982 to 11/1/1985.
As the start of a regional diamond exploration programme with secondary base metal objectives, portion of a detailed low-level airborne magnetic/radiometric survey was flown over the Nilpinna Spring area to define targets for drilling. Field...-
Document
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 1 of 2].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. Exploration carried out over the Peake and Denison Inliers by the joint venturers since mid-2000 has targeted possible large-scale Proterozoic ironstone-hosted...-
Document
Published: 15 Oct 2009
-
The Peake and Denison Project. Project joint annual reports and respective final reports at licences' expiry/full surrender, for the period 1/1/2000 to 20/9/2009. [Index Part 2 of 2].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. In the latter half of 2003, new project partner Phelps Dodge reprocessed aeromagnetic and gravity data and produced a magnetic/structural interpretation, from which...-
Document
Published: 15 Oct 2009