-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Mount Olinthus. Progress reports plus interim final report to licence expiry/renewal, for the period 12/7/1978 to 7/11/1987.
TARGET: Unconformity related, vein-like and vein-type uranium in the Cleve Metamorphics, Katunga Dolomite and Mangalo Schist; lead-zinc sulphides of Broken Hill or Balmat-Edwards type in the Hutchison Group. EXPLORATION: Uranium exploration...-
Document
-
Eyre Peninsula Pb-Zn data package.
Numerous Pb-Zn-Cu-Ag mines and prospects, including the promising Menninnie Dam prospect located 80 km north of Kimba, occur within graphitic, calcareous and psammo-pelitic metasediments of the Palaeoproterozoic (ca 1900-1850 Ma) Hutchison Group on...-
Document
Published: 01 Jan 1991
-
Mount Messenger. Progress reports and final report to licence expiry/full surrender, for the period 14/11/1975 to 13/11/1976.
Ongoing base metal exploration in the Cleve district of eastern Eyre Peninsula has comprised detailed regional mapping, extensive geochemical and petrological sampling, and percussion drilling of selected geochemical anomalies. Assay results indicate...-
Document
Published: 20 Dec 1976