-
Netley Gap. Annual reports and final report to licence expiry/full surrender, for the period 6/7/2016 to 5/7/2019.
A small licence comprising two separate sub-blocks located 4 km and 22 km south-east of Winnininnie on the Barrier Highway has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that...-
Document
Published: 04 Sep 2019
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 2010
-
Kapunda North. First partial surrender report for the period 15/11/2005 to 14/11/2008.
Copper Range's review of literature relating to the modern-era mineral exploration history of the Kapunda district, which had included them studying reports written by Adelaide & Wallaroo Fertilizers that are held in private company archives,...-
Document
Published: 12 Aug 2009
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 2016
-
Commonwealth Hill Station - Central (part of the Commonwealth Hill Project). Second partial surrender report, for the period 11/5/2007 to 10/5/2017.
Six separate portions of the subject licence, with a combined total area of 35 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium, PGEs and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 2019
-
Diesel Dam. First annual report plus final report to licence expiry/full surrender, for the period 16/11/2012 to 15/11/2014.
The Palaeoproterozoic Yarlbrinda Shear Zone is a broad and complex structure, which has both southwards and south-eastwards trending components that bifurcate near Tunkillia. The structure was a conduit for Mesoproterozoic hydrothermal fluids...-
Document
Published: 27 Jan 2015
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-19 - Golden Cross Operations Pty Ltd, Coober Pedy Project, G2 Lineament Corridor gravity/magnetic anomaly IOCG targets. Drilling project final report.
Golden Cross Operations Pty Ltd ('Golden Cross') commenced mineral exploration activities in South Australia with the objective of discovering significant IOCG deposits with the potential to support a major mining operation. In mid-2009, four tenement...-
Document
Published: 25 Nov 2013
-
Lake Cadibarrawirracanna. First annual report plus final report to licence expiry/full surrender, for the period 31/8/2012 to 30/8/2014.
An area centred over Lake Cadibarrawirracanna, which is located ~70 km east-northeast of Coober Pedy, has been explored both for possible buried Proterozoic basement-hosted IOCG-style mineralisation and for large sedimentary evaporite occurrences of...-
Document
Published: 10 Oct 2014
-
Martins Well. Annual reports and final report to licence expiry/full surrender, for the period 13/3/2015 to 12/3/2018.
An area covering a number of historic past small copper-silver and barite workings in the greater Artipena district centred ~ 75 km east-northeast of Hawker was taken up mainly to investigate the hydrothermal copper mineralisation potential of fresh...-
Document
Published: 29 May 2018
-
Data release - as updated : Mount Irwin (part of the Alcurra Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2021.
An area in the eastern Mugrave Ranges centred ~75 km south-east of Kulgera is being explored for possible buried economic magmatic Ni-Cu-PGE mineralisation hosted by inferred Proterozoic Giles Complex layered ultramafic intrusions, and also for...-
Document
Published: 22 Jul 2021
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-34 - Coober Pedy district, Mabel Creek High, Cyclops geophysically anomalous Mesoproterozoic basement IOCG type Au & base metal prospect. Drilling final report
The Cyclops prospect is located approximately 145 km west-southwest of Coober Pedy and ~58 km north of the Challenger mine, along the common boundary between ELs 4891 and 4892, two exploration tenements held by Teck Australia Pty Ltd which were...-
Document
Published: 02 Oct 2015
-
Data release - as updated : Western Lake Gairdner. Annual reports and final report to licence expiry/full surrender, for the period 22/2/2011 to 21/2/2018.
An area centred ~100 km south-east of Tarcoola is being explored for possible economic buried Carrapateena or Prominent Hill style IOCG and polymetallic skarn style mineralisation which may be associated with zones of elevated relief seen in existing...-
Document
Published: 29 May 2018
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-10 - northern Curnamona Province, Woolatchi magnetic anomaly Proterozoic basement IOCG mineral prospect. Drilling project final report.
The PACE Initiative Year 9 collaborative drilling project DPY9-10, which was undertaken between the Callabonna joint venture partners and DSD, aimed to discover a new copper-gold mineralised Iron Oxide Copper-Gold (IOCG) magmatic centre, similar in...-
Document
Published: 30 May 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 2015
-
Copper Coast. Final report, Project ADI RD02-291 [Accelerated Discovery Initiative Round 2, 2022].
IGO Ltd’s (IGO) Copper Coast Project is located along the eastern margin of the Gawler Craton in South Australia and covers Proterozoic rocks of the Stuart Shelf, Torrens Hinge Zone and Adelaide Rift Complex, which form part of the Adelaide...-
Document
Published: 09 May 2022
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). Second partial surrender report, for the period 2/7/2007 to 1/7/2019.
Two portions in the north and south of the subject licence area, with a combined total area of 45 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of...-
Document
Published: 30 Jan 2020
-
Data release - as updated : Mount Nott. Annual reports to licence expiry/full surrender, for the period 17/1/2012 to 16/1/2019.
An area located ~100 km north-west of Kimba, on the southern margin of the Gawler Ranges, is being explored by Investigator Resources for a variety of styles and types of precious and base metal epithermal mineralisation that may have formed in...-
Document
Published: 26 Mar 2019
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 2016