-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
RB 57/00100;Amdel 00297 Lightweight aggregate rotary kiln tests.
There is no abstract created for this record-
Document
Published: 01 Nov 1963
-
RB 79/00098 Steetley's barite deposit - Linkes Lode, Flinders Ranges, ML 3414, Out of Hundreds, County Taunton.
Since 1962, recorded production from Steetley's barite deposit, which forms part of Linke's lode, has totalled 6,237 tonnes. The deposit is in a Class B Environmental Area within the Flinders Ranges National Park. The steep barite lode has formed in...-
Document
Published: 01 Jan 1979
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
RB 95/00030 SAEI Triassic Coal Exploration Program. Exploration Licence Application ELA 228/93, Hawker - Quorn area, South Australia.
The results of a data review by MESA in 1992 to assess the prospectivity of the northern Flinders Ranges for concealed Triassic coal highlighted four main areas as having the best potential for a discovery. Following exploration for coal by MESA/ETSA...-
Document
Published: 01 Jun 1996
-
The Mount Grainger JV Project with Rio Tinto, and the Nackara Arc JV Project with Range River Gold. Progress reports and combined annual reports to the cessation of these joint ventures, for the period 16/6/1999 to 31/1/2006.
The 5 tenements cover 3240km2 of pastoral grazing land centred approximately 45 km northeast of Peterborough within the Orroroo SI54-01 and Olary SI54-02 1:250 000 sheets, in north central South Australia. The Mt Grainger Project Area lies within the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
[Results of a] Mini - Sosie seismic reflection survey, Myall Creek, 1980.
In a trial Mini-Sosie reflection seismic survey carried out over a 750 m section of exploration grid line near Myall Creek, where the method consisted of 6-fold profiling at 5 m trace spacing, the unconformity at the base of the Tapley Hill Formation...-
Document
-
Cattlegrid mine and surrounding lease areas. Mine planning calculations of deposit reserves, including those of orebody extensions, plus a report on a review of copper resources, for the period 1983-1984.
There is no abstract created for this record-
Document
-
Kapunda copper prospect. Exploration progress reports and related consultants' technical reports for the period February 1972 to April 1973.
There is no abstract created for this record-
Document
Published: 27 Apr 1973
-
RB 63/00053;Amdel 00505 Lightweight aggregate. Tapleys Hill Shale (2).
History The results of previous work carried out on the Tapley Hill Formation shale showed that, while a light weight aggregate could be produced from it, the narrow bloating range made processing difficult, owing to agglomeration of the material in...-
Document
Published: 01 Aug 1966
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Mount Gunson (part of the Mount Gunson Project). Reports for the period 15/7/1994 to 24/3/2016.
There is no abstract created for this record-
Document
-
Kapunda. Progress reports, annual reports and technical consultants' reports submitted until licence expiry/full surrender, for the period 30/11/1981 to 29/5/1985.
Economic evaluation of the Kapunda copper deposit for open pit mineability has included the acquisition of experimental and ore - definitive EIP and MIP surveys along strike extensions of the main fault zone, the commissioning of consultants' detailed...-
Document
Published: 29 Jul 1985
-
Leigh Creek. Progress and annual reports to licence expiry/renewal for the period 4/3/1974 to 3/3/1976.
Ongoing exploration of abandoned historic mine workings and the surrounding area at the Mountain of Light prospect, located approximately 2 miles east of Copley, was aimed at delineating an economic copper oxide/carbonate - mineralised orebody and any...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 14/7/1998 [ Index Part 1 of 4 ].
An area of open ground encompassing the historic Mount Gunson mining district on the Stuart Shelf and three existing mining leases was taken up by David Clarke to explore for possible economic copper-cobalt mineralisation and any other precious or...-
Document
-
RB 61/00087 Lightweight aggregate, Tapleys Hill Shale.
Preparation of lightweight aggregate from a sample of Tapleys Hill shale, as successfully achieved by 'bloating' (the expansion of a viscous melt of crushed rock particles by trapped gas released during fusion in a rotary kiln), is described. Six...-
Document
Published: 01 Aug 1965
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Yerelina. Annual reports for the period 18/9/2012 to 17/9/2018.
An extensive covered area centred ~100 km north of Leigh Creek and lying immediately west of the exposed basement rocks of the Mount Painter Inlier is being explored for possible Mount Isa style stratiform or Mississippi Valley type stratabound...-
Document
Published: 13 Nov 2018
-
RB 2011/00009 A re-evaluation of the gold potential of Mount Grainger Goldfield.
It has lately been shown that the gold grades previously determined from a standard laboratory analysis of grab, rock chip and channel samples collected from Mount Grainger Goldfield may be unreliable, due both to the ore mineralogy and to the patchy...-
Document
Published: 01 Jan 2011