-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Data release [made at SA Director of Mines' discretion] : Poochera Industrial Minerals Project. Annual reportS, for the period 1/9/2015 to 31/8/2018.
Exploration activity on Exploration Licences 5016 (Whichelby), 5308 (Mount Hall), 5398 (Sceales), 5787 (Yanerbie) and 5814 (Tootla) is focused on gypsum and kaolin deposits. The tenements are grouped in the Poochera Project Amalgamated Expenditure...-
Document
-
Mount Gunson copper deposit. Cattlegrid orebody sample testing by metallurgy and mineragraphy (results of 1973 and 1974 studies).
There is no abstract created for this record-
Document
-
Assessment of the Mount Gunson Mines Pty Ltd operation.
Problem situations associated with the operation of the concentrator, and recommendations as to the modifications needed to put the plant into a satisfactory operating condition for a start up, are discussed.-
Document
-
[Metallurgical] Investigation of [decreasing operating efficiency of] copper concentrating plant at Kadina. Progress reports from 6/3/1975 to 11/5/1984.
The main problem, leading to poor recoveries of copper from the Kadina - Wallaroo tailings dump materials being put through the Kadina copper concentrator, is an increasing amount of oxidized sulphide minerals in the treated tailings. Testing by...-
Document
Published: 11 May 1984
-
Thermoanalytical investigation of a sample of Mount Gunson copper concentrate.
Investigates the likelihood of mineral concentrates becoming oxidized and liberating toxic sulphur dioxide gas during their transport to Japan. The sample examined is quite stable, but is not representative of the concentrate likely to be produced...-
Document
-
Redcliff. Progress reports to licence surrender, for the period 12/1/1976 to 21/10/1977.
Reports provide a history of the assistance given by the licensee and State Government officials to Dow Chemical Co. to enable their re-assessment of the viability of the proposed Redcliff Petrochemical Plant and associated raw material sources.-
Document
-
Aquifer study of the southeastern Cooper Basin in South Australia - Toolachee and Nappacoongee-Murteree (farmout) Blocks.
Recognition of the adverse technical implications of known active aquifer pressure support and interpool communication between Permian gas reservoirs of the southeastern Cooper Basin requires that an estimate of aquifer size be undertaken to...-
Document
-
Tirrawarra 17. Test reports.
There is no abstract created for this record-
Document
-
Utilization of Cooper Basin LPG for the manufacture of gasoline.
Cost studies for converting some of LPG to high octane alkylates and blending these with condensate to produce premium grade gasoline at two sites. Stony Point and Port Stanvac appear to be marginally viable.-
Document
-
East Lagoon [ore reserves estimates, post - open pit mining] reconciliation.
Ore reserves were recalculated to investigate the discrepancies between amounts of contained copper delivered to the mill and some much higher pre-production estimates. The apparent reason for the difference was over-optimistic pre-production...-
Document
Published: 08 Apr 1971
-
PEL 30. Progress reports from 12/2/85 to 12/2/88.
Exploration for sodium carbonate, base metals and petroleum included detailed logging and sampling of Byilkaoora 2, seismic survey (76 km of 60 fold Vibroseis data recorded at 30 metre intervals), and drilling and shooting of 10 upholes, geologically...-
Document
-
Gas chromatographic analysis of Tirrawarra oil, and chemical analysis of Tirrawarra and Moorari coals.
In September 1971, CSIRO was supplied by the Delhi International Oil Corporation with eight coal samples and one oil sample from the Moorari No.l, Tirrawarra No.l and Tirrawarra No.2 ·Wells. The hydrocarbons extracted from the coal samples were...-
Document
-
Cooper Basin hydrocarbon characteristics and gas-liquids composition.
This report summarises basic data relating to the stratigraphic and geographic distribution, composition and recovery efficiency of Cooper Basin hydrocarbons. Their possible geological controls are discussed, with the aim of refining pre-drill...-
Document
-
Crude oil characterisation and correlation study, twenty-seven oils, South Australia-Queensland Cooper-Eromanga Basin.
27 oil samples obtained on drillstem testing of various Mesozoic and Permian formations in wells spread across the Delhi-Santos petroleum exploration licence areas were subjected to organic geochemical analysis to determine their geochemical...-
Document
-
Moorari 1. Test reports.
There is no abstract created for this record-
Document
-
Lithologs and coal analyses of lignites and lignitic clays sampled from fifteen holes drilled in the eastern Eucla Basin.
There is no abstract created for this record-
Document
-
Greenly 001 EPP 26. Basic well completion report.
Greenly 1 wildcat was located in the southern part of EPP 26, approximately 10 km southeast of Platypus 1, 40 km west-northwest of Duntroon 1, and 150 km southwest of Port Lincoln. It was directionally drilled over the period 4 June to 14 August 1993...-
Document