-
RB 77/00141 Failure in overburden and coal, lobe D, Leigh Creek.
There is no abstract created for this record-
Document
Published: 03 May 1978
-
RB 79/00153 Little Para Dam water treatment works - assessment of bedrock for trial anchor pull-out tests.
Drill cores from six holes drilled by the South Australian Engineering and Water Supply Department at the site of the proposed Little Para Dam Water Treatment Works were logged, paying particular attention to core loss, rock defects and intensity of...-
Document
Published: 01 Jan 1980
-
RB 79/00022 Noarlunga Regional Centre Community College foundation investigation - Public Buildings Department.
15 auger holes which were drilled to a maximum depth of 10 m have shown a gently dipping sequence of Quaternary silt and clay, passing down at about 6 m depth into a dense Tertiary sandstone. The highly calcareous, plastic silt which occurs...-
Document
Published: 01 Jan 1979
-
RB 80/00098 Foundation geology of the Northern Power Station.
The Northern Power Station, presently under construction, is the third power station to be built at Port Augusta. Two previous stations (Playford A and B) were constructed during the 1950s, although investigations into the feasibility of using the...-
Document
Published: 01 Sep 1980
-
RB 78/00046 Preliminary investigations of the Beetaloo Dam wall and spillway drainage area.
Diamond drilling and geophysical logging of 5 holes into the dam wall has shown the concrete to be significantly decayed in places. Geological mapping was also undertaken in the area adjoining the spillway.-
Document
Published: 01 Jan 1978
-
RB 78/00128 p: na Land instability in the Adelaide metropolitan area 1978 - Two case histories.
Describes 2 areas of instability at Hallett Cove Railway Station and on Greenhill Road.-
Document
Published: 01 Jan 1978
-
RB 91/00096 Probabilistic method for estimating gas reserves.
The Departments method for estimating and reporting gas reserves has been revised to include estimates of tight gas as well as providing more accurate estimates of conventionally recoverable gas reserves. This has included a new method for...-
Document
Published: 01 Nov 1991
-
RB 93/00024 Orroroo town water supply.
For the past 30 years or more, much of the town water supply for Orroroo has come from wells that are completed in the confined aquifer of the Walloway Basin. The unconsolidated, fine, silty sands of this aquifer become mobile and have led to a...-
Document
Published: 01 Feb 1993
-
RB 96/00010 Musgrave Proclaimed Wells Area groundwater assessment.
The County Musgrave Proclaimed Wells Area on Eyre Peninsula, situated mainly near Elliston and extending eastwards towards Lock, contains a number of small groundwater lenses of potable quality which are surrounded by brackish to saline groundwater....-
Document
Published: 01 Jan 1994
-
RB 99/00005 Initial investigation of the salinity impact of leaking wells, Northern Adelaide Plains Prescribed Wells Area.
An initial investigation was undertaken by The Department of Primary Industries and Resources SA (PIRSA), into the increase in salinity within wells on the Northern Adelaide Plains (NAP). This involved interpreting groundwater salinity data from a...-
Document
Published: 01 Apr 1999
-
RB 94/00009 Soils, stratigraphy and engineering geology of near surface materials of the Adelaide Plains.
Metropolitan Adelaide is founded on a wide variety of soils that overlie sediments and rocks. Some of the soils and sediments react to seasonal and human-induced changes in water content with marked changes in volume. The black earths and...-
Document
Published: 01 Jul 1996
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
RB 99/00023 Importance of fractured rock aquifers.
Groundwater held within fractured rock aquifers has been shown to be obtainable from a number of vastly different geological settings, including indurated sediments, low to high-grade metamorphics, acidic and basic volcanics, and intrusive igneous...-
Document
Published: 01 Oct 1999
-
RB 98/00030 Lineament associations in the Cooper Basin region, South Australia - Basement controls on hydrocarbon distribution.
Detailed lineament analysis of the Cooper Basin area has established the presence of two lineament networks. A gas-prone network of NW and NE trending lineaments shows strong correlation with the presence of gas in alternating blocks, but no gas...-
Document
Published: 01 Sep 1998
-
RB 99/00014 Fracture analysis of the eastern Warburton Basin (Early Palaeozoic), South Australia.
Cambro-Ordovician Warburton Basin strata and intrusive granites are conventionally regarded as the economic basement beneath the Cooper-Eromanga oil and gas province in northeastern South Australia and southwestern Queensland. This study, the first...-
Document
Published: 01 Jul 1999
-
RB 90/00032 Cliff stability, Aldinga, South Australia.
A preliminary study was made of the near vertical coastal cliffs adjacent to Gordon and Stock Street, Aldinga. Continued landsliding of soil-strength cliff-forming materials and toe erosion by the sea have threatened the clifftop esplanade roadway,...-
Document
Published: 01 Apr 1990
-
RB 91/00018 Myponga water filtration plant - Site B, site investigations.
Ground conditions to be expected during construction of the proposed Myponga Water Filtration Plant were determined for the EWS Dept. Twenty two backhoe pits were logged and 800 metres of seismic refraction profiling was carried out. Both the site of...-
Document
Published: 01 Feb 1991
-
RB 91/00073 Tod River Reservoir preliminary geotechnical study.
There is no abstract created for this record-
Document
Published: 01 Jul 1991
-
RB 92/00018 Holdfasts for rock climbers: Morialta Conservation Park.
Holdfasts were installed at Morialta Conservation Park to improve safety for rock climbers. Twenty three rockbolts were grouted into holes drilled into rocks of the Stonyfell Quartzite Formation. Two rockbolts were grouted into cast concrete blocks...-
Document
Published: 01 Apr 1992