-
Penola Seismic Survey. Reports for the period 15/3/88 to 9/12/88.
AIM: This detailed seismic survey of 12 lines totalling 90.2 line km was proposed to define an optimum location on the Katnook Structure at which to locate an appraisal well for further drilling evaluation of the Katnook gas discovery. In addition to...-
Document
Published: 09 Dec 1988
-
1992 Beachport Seismic Survey. Reports for the period February to June 1992.
AIM: To acquire further detailed reflection seismic coverage of the south-west of the licence area to resolve doubts about the currently mapped closures on the following structures: (i) The Woakwine Prospect, a tilted fault block near the intersection...-
Document
-
1991 Saint Clair Detail Seismic Survey. Reports for the period 2/1/91 to December 1991.
AIM: To add detail to several leads identified by the 1990 Saint Clair Seismic Survey, and to provide further regional coverage, particularly in the north-western part of the licence area. The proposed programme of dip and strike lines will address...-
Document
-
1991 seismic survey, Mount Bruce, final report.
AIM: To complete a roughly 1 km-spaced, semi-detailed reflection seismic grid across an area of interest in the north of PEL 52, 3 new infill lines totalling 21.4 line km were acquired in the 1991 Mount Bruce Seismic Survey. Together with the...-
Document
-
1990 Greenways Seismic Survey proposals. Reports for the period 9/2/90 to 6/3/91.
AIM: To acquire 18 line kms of detail seismic to firm up a drilling prospect, to satisfy the carried-over part of the PEL 38 Year 1 licence work commitment. In actuality this survey was not carried out: instead the licensees elected in April 1991 to...-
Document
-
1990 Saint Clair Seismic Survey. Reports for the period 16/11/89 to October 1990.
AIM: To provide a regional grid of reflection seismic data over the Saint Clair Trough, and to mature several leads on the southern flank of the trough, including the Woakwine feature identified earlier. Most of the area to be covered by the 1990...-
Document
-
1991 marine seismic survey, OH91, final report.
AIM: To detail certain prospects and leads identified from interpretation of pre-existing seismic data, in order to mature at least one play for drilling in permit Year 4. METHODS: Survey dates: 3 - 6/5/91. Energy source: Air gun. CDP coverage: 6000%....-
Document
-
1997 Stockdale Seismic Survey. Reports for the period February 1997 to May 1998.
AIM: To further delineate the Stockdale lead, the Churinga Prospect, the Sugarloaf Prospect and several small fault bounded leads along the southern side of the central uplift zone of the onshore Robe Trough, with the expectation of then being able to...-
Document
-
1996 Long Island Seismic Survey. Reports for the period 19/12/95 to June 1997.
AIM: To derive a clearer understanding of the morphology and structural style of the Robe Trough and its margins, and to detail structural leads identified within the central part of the trough, where a number of possible fault-bounded closures had...-
Document
-
1992 detail seismic survey, Greenways, final report.
AIM: To acquire a minimum of 50 line kms of detail seismic by 31 March 1992, to satisfy the varied PEL 38 Year 2 licence work commitment. Following the drilling of Greenways 1 (VP 296, line OHE 86-134), where a drillstem test run in a basal Eumeralla...-
Document